My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98768
DRMS
>
Back File Migration
>
Revision
>
REV98768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:47 AM
Creation date
11/22/2007 12:21:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/13/2001
Doc Name
POWDERHORN COAL CO PN C-1981-041 MR 049 OPERATION OF UNIT LOADOUT BY LODESTAR ENERGY INC
From
DMG
To
J E STOVER & ASSOC
Type & Sequence
MR49
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T _ <br />JUL-13-G1 05:54PM FROM-Colorado Division of Minerals i Gaoloty +13038663567 T-113 P 00 III III III III IIII III <br /> sss <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depar[mcnt of Natural Resources <br />7313 Sherman $t.. ROOM 215 <br />D i v i s t o N o f <br />Denver, Colorado a0203 <br />Phone: 1303) a66-3567 M I N E LtA L S <br />FAX; (3031 832-8106 be <br />Julyls,2oo1 GEOLOGY <br /> RECLgn gTiON <br />Jim $tOVer MINING•Sq FETT <br />J.E. Stover and Associates <br />2768 Compass Drive, Suite 101 Bill Owens <br />Grand Junction, Colorado 81506 eO6ef"°` <br /> Gr°R C. watcher <br />RE: Powderhom Coal Company Eaeculi~c Director <br />Permit C-1981-041 rotichael 9. long <br /> Divifion D?cQOr <br />Mtnor Revision 049 <br />Operation of Unit Train Loadout by Lodestar Energy, Ync. <br />Dear Mr. Stover: <br />We have reviewed the referenced revision application, and have determined it to be incomplete at this time. <br />We need to have certain issues clazified before proceeding with review of the application. Please address <br />the following items: <br />1. Please specify in the amended application text the term of Lodestar's coal contact under which <br />the loadout will be operated, and the end date for Lodestar's use of the loadout <br />Please include revised permit materials with a commitment to initiate reclemaaon of the loadout <br />Bad rail spur in accordance with Figure 14- 1, within the earliest of the following time periods: <br />within 60 days of termination of the coal contract allowing loadout use; or within 60 days from <br />expiration of the term of the coal contract; or within 60 days of the nonuse of the loadout for 90 <br />days or more, whichever is earliest. Also clarify in revised permit materials, that all po[Tions of <br />the mine site other than the loadout and spur will remain in permanent cessation, and that the <br />reclamation timetable specified in Figure 14-1 for all areas of the mine ocher than the loadout and <br />spur will not be affected by loadout operation. Please provided revised permit pages which reflect <br />these changes to the Roadside Mine reclamation schedule. <br />3. The statement oa emended page 13-5 that "2000 calendar yeaz is Yea 1 of the reclamation <br />schedule..." is erroneous, and should be corrected to stare "2001 calendar year is Year 1..." <br />Please address the maximum coal tonn~ce to be stored at any one time at the loadout, demonstrate <br />that compliance with applicable air quality penniu will be maintained, and address the effect that <br />Lodestar's proposed activity at the loadout will have on worst case disturbance and reclamation <br />cost for the site. <br />Please contact me if you have nay questions. <br />S' C bly, <br />!~ <br />an .Mathews <br />vironmental Protection Specialist <br />c: David Berry <br />
The URL can be used to link to this page
Your browser does not support the video tag.