Laserfiche WebLink
• 4~,EHr or rh <br />opP ~~r '~ Zm <br />~~. <br />_ a <br />q s <br />j a <br />- '9 • <br />EACH ~ \0 <br />U. SEPT. OF THE INT~ZIOR III ~~~~~~~~~~~~~~~~ ~~~Q <br />OFFICE OF SURFACE MINING RECLAMATION AND ENFORCI~MN:NT99o ~ -~~° <br />Mine-Site Evaluation Inspection Report cFOFS~FA~,~€=~ <br /> ]0. Type <br />1. Permittee/Person 9. Permit Number a. Permit b. RA <br /> COLORADO YAMPA COAL COMPANY C-81-071 PP <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> <br /> 29588 ROUTT COUNTY ROAD # 08/18/93 SPl ~Y Y/N <br /> M.v-eo-rr <br />3. City 4. State 14. Permit Status I5. Site Status 16. Facility Type <br />OAK CREEK CO A~ Pl A~ <br />5. Zip Code 6. Phone Number 17. OSM Office k l8. RSI # 19. Land Cade <br />80467 -~ 303-879-3800 020 <br />7. Operator if Different than Perm ittee 20. M.S.HA. ID N 21. State Code 22. County Cade <br /> OS-02710 OS 107 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number 23b. State Office <br /> ECKMAN PARK 1&2 D D <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom liaac 3=Not Plana 4=Not S -Noncom licence Identified Elsewhere <br />A. Administtive D. Bac3cfilling & Grading H. 3 Subsidence Control Pfau <br />1. 1 Mining within Valid Permit 1. 3 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1. 3 Road Constmction <br />3._Terms & Conditions of Permit 3. 1 Approximate Original.Contour 2. 3 Certification <br />4._Liability Insurance 4. 1 I-Iighwall Elimination 3. 3 Drainage <br />5.-Ownership and Control 5. 3 Steep Slopes (includes downslope) 4. 3 Surfacing and Maintenance <br />6. 3 Temporary Cessation 6. 3 Handling of Acid & Toxic Materials 5. 1 Reclainadon <br /> 7. 1 Stabilization (rills and gullies) - <br />B. Hydrologic Balance <br />l. 3 Drainage Control E. Excess Spoil Disposal J. Signs & Markers <br />2._Inspections & Certifications 1. 3 Placement 1.-Signs <br />3. 3 Siltalion Structures 2. 3 Drainage Control 2.-Markers <br />4.~Discharge Structures 3. 3 Surface Stabilization K. 3 Distaste Prohibitions <br />5. 1 Diversions 4. 3 Inspections & Certifications - <br />6. l EtTluent Limits L. Revegetation <br />7._Ground Water Monitoring F. Coal Mine Waste 1. 1 Vegetative Cover <br />Stuiace Water Monitoring <br />8. (Refuse Piles/Impoundments) 2. 1 Timing <br />_ <br />9. 3 Drainage -- Acid-Tonic Materials 1. 3 Drainage Control <br />10.3 Impoundments 2. 3 Surface Stabilization M. 1 Pos[mining Land Use <br />11.3 Stream Buffer Zones 3. 3 Placement ~ F= ("'; ~ : l c <br />` <br />~ <br />~ <br /> 4. 3 Inspections and Certifications N. Other " <br />- ' <br />-- <br />' <br />C. Topsoil & Subsoil 5. 3 Impounding Structures <br />1. 3 Removal G. Use of Explosives -1) <br />2. 3 SubstituteMaterials 1. 3 BlasterCertitication 2) <br />3. 3 Storage and Protection 2. 3 Distance Prohibitions - <br />4. 3 Redistribution 3. 3 Blast Stnvey/Schedule 3) - ,~ ~„~ <br /> 4. 3 Warnings & Records - <br /> 5. 3 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Date of Lasl <br />Stale Complete <br />Inspedion 05/26/93 <br /> <br />0 a Permit Review <br />10 a. Total <br /> <br />0.0 bonded <br /> . 7050.0 <br />~ Perrttitted <br />Frequency ror previous 4 Cal®dar Qtrs. b. Phase I <br />b. Number of Number of <br />regmred ^ mmplete ^ <br />complete 4 inspections 4 S.5 b. Inspection Tune f1.0 released <br />2375.0 b. Disnabed <br />utspediorts wnduded ~ <br />9'~ ~ c. Phan Q <br />0.0 released (Estimated) <br />c Number of Number of c. Travel Tune <br />p~aruu~el~ ~g in~speaiore ~g 10.0 <br />ort Writin <br />d <br />Re 0.0 ~ ~'~ ~ <br />released Page 1 of <br />inspecbora mndudetl g <br />. <br />p ~„~~,r,r~ <br />