Laserfiche WebLink
To reflect the changes associated with the revised Shaft #3 site, please find enclosed the <br />following: <br />.Redline version and non-redline version of page 2.05-53 which adds the Shaft #3 topsoil <br />stockpile <br />.Revised Golder Drawing 4 (not to be incorporated into the permit) <br />.Revised SedCAD runs <br />.Redline version and non-redline version of Table 43E-1 summarizing changes to watersheds <br />.Non-redline version of Table 44E-1 summarizing changes to ditches and culverts <br />.Revised Map 3E which shows the revised watersheds <br />.Redline version and non-redline version of Exhibit 69 to include the revised Shaft #3 site <br />.Revised Map 53B which shows the revised configuration of Shaft #3 pad <br />.Revised Map 54B which shows the revised and new locations of ditches and culverts <br />.Revised Map 58B which includes the reclamation plan for the Shaft #3 pad <br />.Revised Map 59B which includes two new cross-sections through the Shaft #3 site <br />MCC requests your prompt attention to this application and would welcome telephone calls <br />and/or faxed letters to avoid the delays sometimes associated with mailed correspondence. <br />Sincerely, <br />,~'~ /~~ ~ <br />Chnstme E. Johnston <br />Permitting Specialist <br />cc: Eric Mende <br />Chris Nyikos <br />Phil Schmidt <br />Kathy Welt <br />Enclosures <br />~~ i 9.a« <br />