Laserfiche WebLink
•olora~io Division of Minerals and Geology • <br />ESTIMATING FORK - STRUCTURAL DEMOLITION WORN <br />-------------------------------------------- <br />-------------------------------------------- <br />Task No.: Prepared t,y <br />Permit Nu.: H-78 3a2 Filename <br />Date 30-Der 92 Operation <br />Permitting action Succesiun of Operator <br />sheet 1 of 2 <br />iDG <br />M342-6 <br />Ellison Mine <br /> <br />Tasl'. deSCr1pt10n DemOl lsh 6 remove shop, Fuel tanks, pOr tdl housing 5 pmwerllrie <br />MEANS Location Adjustment: 102.50Y of base unit costs -HEARS SITE WORE 6 LANDSCAPE COST DATA : 1992 Edition <br />I I MEANS BASE ADJUSTED <br />STRUCTURE / FACILITY ~ EuUIPNENi pESCRIPT]OH ~ U111ENS1UNS ~ COMPOSITION ; QUANTITY ~ UHIT .UNIT COST .TOTAL COST <br />Shop building (no pad or footing) .Assume 25'L~20'W#10'11 .sheet metal ~ S,OAO . cu.ft. ~ f0.17 ~ 5871 <br />Portal housing (no pad or footing! ~ Assume 10'L+12'N-10'H ;sheet metal 1,200 ~ cu.ft. ~ f0.17 ~ E209 <br />Fuel tank Yt NA (not installed) ~ ' <br />Fuel tank E^ - NA loot insEalled!. <br />, <br />, <br />Remaining materials ddebris -Nh none on rile <br />I <br />Powerline lrroition from dist.. line to mine) I hssumg ~iOO LT ~ steel%wood 40U ~ In.ft.. E1.72 E705 <br />, <br />~ ~ ~ ~ , <br />, <br />, <br />, <br />, <br />, <br />, <br />, ~ ~ ~ ~ <br />, ~ , <br />, <br />, <br />- ~ ~ , ~ <br />, , <br />, <br />, <br />, <br />, <br />TASK SUBTOTAL -sheet 1 E1,186 <br />