Laserfiche WebLink
3. Any proposed a~ities in, or adjacent to, these buff ones will require approval <br />from the BLM, on asite-specific basis, after consultation with the U.S. Fish and <br />Wildlife Service. <br />Criterion 15 <br />Coal related surface facilities and surface disturbances will be authorized in the review area <br />only if no feasible alternatives exist. The BLM will coordinate with the Colorado Division of <br />Wildlife to determine the type and extent of allowable variances. Coal exploration, facility <br />construction, and major scheduled maintenance will not be authorized on the lease from <br />December 1 through April 30. All unavoidable surface disturbances will require approval of <br />the BLM's Authorized Officer. <br />The above exemptions to the Coal Unsuitability Criteria will be incorporated as mitigation <br />measures in the EA and as stipulations in the coal lease and Fi/W. <br /> <br />10 <br />