My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98657
DRMS
>
Back File Migration
>
Revision
>
REV98657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:42 AM
Creation date
11/22/2007 12:20:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
8/29/1997
Doc Name
MESITA HILL PIT PN M-77-227 DIVISIONS 8/18/97 ESTIMATE OF RECLAMATION COST
From
DMG
To
COLO AGGREGATE
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br />sheet 1 of 2 <br />Task No.: 5 Prepared by .ICS <br />Permit No.: M-77-227 Filename M227-5 <br />Date 29-Aug-97 Operation Mesita Hill <br />__________________ __________________________ <br />Permitting action Estimate reclamation cost <br />_________________________________________________________________________________________________ <br />Task description Structure removal using compromise cost data <br />_________________________________________________________________________________________________ <br />MEANS Location Adj uetmen[: 105.50} of base unit costs - MEANS SITE WOR% fi LANDSCAPE COST DATA 1995 Edition <br />__________________ _________ <br />STRUCTVRE / FACILITY / EQUIPMENT DESCRIPTION DIMENSIONS <br />Metal shop building ~ estimated 90x50x8 <br />Concrete Eloor for shop buildrng ~ estimated 40x50x.5 <br />Slone storage building ~ estimated 15x18xB <br />Concrete floor for sto ne storage building ~ estimated 15x1Bx.5 <br />Concrete pad With stone storage building ~ estimated 15x10x.5 <br />Concrete block storage building ~ estimated 1Bx30xB <br />Concrete Eloor for con block building ~ estimated 1Bx 30x.5 <br />Large concrete storage pad ~ estimated BOx 90x.5 <br />Large coot re[e storage pad ~ estimated 75x100x.5 <br />Concrete storage bins, floor ~ estimated 115x25x.5 <br />Concrete storage bins, back wall ~ estimated 115x12 x.5 <br />Concrete storage bins, interior valle estimated 7x25x12x.5 <br />Disposal of concrete debris offsite ~ estimated 462 cu.yds <br />I <br />COMPOSITION QUANTITY <br />metal 16,000 <br />concrete ~ 2,000 <br />stone ~ 2,160 <br />concrete ~ 270 <br />concrete 150 <br />con block ~ 4,320 <br />concrete ~ 540 <br />concrete ~ 8,100 <br />concrete 7.500 <br />concrete ~ 2,875 <br />concrete ~ 1,380 <br />concrete ~ 2,100 <br />concrete ~ 462 <br /> MEANS BASE ~ AD.TUSTED <br />UNIT ~ UNIT COST ~ TOTAL COST <br />cu. ft. ~ .`7-$0.10 ~ $3,038 <br />sq. ft. i' plj $2.00 i 54,220 <br />cu. ft. ~ :lr $0.29 ~ $547 <br />aq. f[_ ~ $2.00 ~ $570 <br />cu. ft. ~ ~\r $0.24 ~ $1,099 <br />eq. ft. $2.00 ~ $1,139 <br />eq. ft. ~ $2.00 ~ $17,091 <br />aq. ft. ~ $2.00 ~ $15,825 <br />e q. f[. ~ $2.00 ~ $6,066 <br />eq. ft. ~ $2.00 ~ 52,912 <br />sq. ft. ~ $2.00 ~ $4,431 <br />cu. yd. ~ $9.67 ~ $4,713 <br /> ~ n~~5 ~ <br /> ~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />I ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />I ~ <br />TAS% SUBTOTAL - sheet 1 $61,697 <br />
The URL can be used to link to this page
Your browser does not support the video tag.