Laserfiche WebLink
r <br />4. Projected life of mining in Sections 32 and 33 (approval of <br />actual mining must be handled under a permit revision). <br />In conjunction with the Midterm review, the Division will focus on <br />subsidence issues, probable hydrologic consequence, alluvial valley <br />floor issues and other items related to mining at the Roadside <br />North Portal. <br />In conclusion, MR-24 may be partially approved to include the 5- <br />year mining projection, life of mining on Exhibit 5 and concerns 1, <br />2, 5, 6, 8, 9 and 10 from the DMG letter dated November 28, 1994. <br />All text and reference to projected mining will need to be <br />submitted in the form of a technical revision to the Roadside <br />Portals permit. <br />If you have any questions, please do not hesitate to call. <br />Sinc rely, <br />_ S ~'~~ <br />Erica S. Crosby <br />Environmental Protection Specialist <br />cc: Larry Routten <br />c:\roadside\941201 <br />