My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/22/2007 12:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Phase IVc Ore Storage Area Liner Certification Report
From
Anglo Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -26- 043-2170 <br />• 5.0 GEOSYNTHETICS CQC SUBMITTALS <br />Geosynthetics CQC submittals reviewed by Golder included installation personnel resumes, <br />geomembrane resin certificates, geomembrane roll certificates, welding rod certificates, geogrid <br />certificates, and geotextile certificates. Golder's inventory control, summazizing CQC certification <br />received for each roll of geomembrane received for the Phase Nc composite liner system, is <br />presented in Appendix J-1. All geosynthetic material used as part of the Phase Nc OSA construction <br />met project specifications. <br />5.1 Geomembrane Installation Personnel Resumes <br />Golder reviewed the resumes of Poly-Flex installation personnel to verify that the installation <br />superintendent and the seaming personnel possessed sufficient experience as required by the project <br />specifications. Review of the installation personnel resumes indicated that key personnel had <br />experience sufficient to meet or exceed project specifications. Geomembrane personnel resumes are <br />presented in Appendix J-2. <br />• 5.2 Geomembrane CQC Documents <br />CQC documents submitted by Poly-Flex included resin supplier certificates and geomembrane <br />manufacturer resin certificates, geomembrane roll certificates, and welding rod certificates. Golder <br />reviewed CQC documents prior to geomembrane placement and verified that the documentation was <br />complete and that the material properties and CQC testing frequency required by specifications were <br />met. <br />5.2.1 Resin COC Certificates <br />LLAPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br />Chevron Phillips Chemical Company, at a frequency of one per rail caz shipment. Golder reviewed <br />these certificates prior to geomembrane placement. The geomembrane manufacturer also performed <br />density and melt index tests of the resin supplied by Chevron Phillips Chemical Company to verify <br />material properties prior to geomembrane manufacture. The CQC certificates provided by the resin <br />manufacturer aze presented in Appendix J-3. <br />~~ <br />>:wxux~awiao~an-Qnenrvo-~owwux~xo.woo.~xusc.nenrv~a~ Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.