My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/22/2007 12:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Phase IVc Ore Storage Area Liner Certification Report
From
Anglo Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -14- 043-2170 <br />• <br />• <br />r1 <br />LJ <br />placed approximately 192,900 cubic yards of DCF in the Phase Nc OSA. DCF was placed in a <br />minimum 2-foot thick lift over the geomembrane. During fill placement, PVC grade markers were <br />placed at grade breaks and on a maximum 50-foot by 50-foot grid. After DCF placement and fmal <br />survey, PVC grade mazkers were removed, and Ames performed any additional grading required. Ames <br />placed DCF in an uphill direction on any slopes steeper than 4H:1 V. <br />2.10 Surface Water Diversion System <br />As part of the Phase Nc OSA construction, the northern portion of the Phase N permanent surface <br />water diversion channel was constructed, as presented in IFC Drawing 8a and Record Drawing 1. <br />The permanent surface water diversion channel constructed during Phase Nc OSA construction <br />consists of approximately 1,400 linear feet of 24-inch SDR17 HDPE pipe (two pipes side-by-side) <br />and inlet and outlet structures. During Phase Nc OSA construction, approximately 1,270 linear feet <br />of 24-inch HDPE piping, 250 linear feet of 26-inch steel pipe at a haul road crossing, and inlet and <br />outlet structures were constructed. The surface water diversion system was designed to safely control <br />and divert runoff resulting from the 100-year, 24-hour storm event from the contributing upstream <br />watershed azea. A trash rack was placed at the inlet structure to limit plugging at the pipe entrance. <br />Riprap was placed at the pipe inlet and outlet to control scour at the pipe entrances and exits. <br />~:w,u,mw+amcm~nenrvo-xoaawuxxxo.aao.xxwc.nenrv~a~ Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.