October 2004 -9- 043-2170 <br />• approximately ] 0 feet below the fmished surface Bade. The surface of the CSB <br />was compacted using the shovel from a CAT 3306 excavator. A 3-foot minimum <br />CP was cast into the shaft and allowed to cure for a minimum of 7 days. A <br />minimum 7-foot thick layer of CR was then placed onto the CP. SF was then <br />placed to the final Bade, as needed. in some cases, the excavation did not require <br />placement of CSB prior to placement of the CP and CR. <br />For open workings where the depth to competent bedrock was Beater than 7 feet to <br />the final SLF subgade surface, the excavations were backfilled with CSB to 3 feet <br />below the soil bedrock interface. The surface of the CSB was compacted using the <br />shovel from a CAT 3306 excavator. A 3-foot minimum CP was cast into the shaft <br />and allowed to cure for a minimum of 7 days. A minimum 7-foot thick layer of CR <br />was then placed onto the CP. After the CR was allowed to cure, SF was then placed <br />to the final grade, as needed. In some cases, the excavation did not require <br />placement of CSB prior to placement of the CP and CR. <br />• For collapsed workings extending deeper than 25 feet and where the depth to <br />competent bedrock was less than 7 feet to the final SLF subgade surface, the <br />collapsed materials were excavated to a depth of 25 feet below fmished grade. The <br />excavations were either backfilled with CSB to approximately 10 feet below the <br />finished grade or shaped for the CP at a workable depth below 10 feet. The surface <br />of the CSB or existing material was compacted using the shovel from a CAT 3306 <br />excavator. A 3-foot minimum CP was cast into the shaft and allowed to cure for a <br />minimum of 7 days. A minimum 7-foot thick layer of CR was then placed onto the <br />CP. After the CR was allowed to cure, SF was then placed to the final grade, as <br />• needed. in some cases, the excavation did not require placement of CSB prior to <br />placement of the CP and CR. <br />For collapsed workings extending deeper than 25 feet and where the depth to <br />competent bedrock was greater than 7 feet to the final SLF subgade surface, the <br />collapsed materials were excavated to a depth of 25 feet below finished grade. The <br />excavations were either backfilled with CSB to approximately 3 feet below the <br />soiUbedrock interface or shaped for placement of the CP. The surface of the CSB <br />was compacted using the shovel from a CAT 3306 excavator. A 3-foot minimum <br />CP was cast into the shaft and allowed to cure for a minimum of 7 days. A <br />minimum 7-foot thick layer of CR was then placed onto the CP. After the CR was <br />allowed to cure, SF was then placed to the final Bade, as needed. <br />• Shallow surface pits that were less than 25 feet deep below the final SLF subgade <br />surface were excavated to bedrock or pit termination. The pits were then backfilled <br />with compacted SSF and SF to the final subgade elevation. <br />In some cases, shallow surface pits were completely removed during slope re- <br />contouring and required no further remediation. <br />• <br />Golder Associates <br />