Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />RECLAMATION COSTS <br /> <br />Phase I <br /> Previously ca lculated for original permit $98,700 <br />Phase II <br /> 8.1 acres to be sloped, graded, plated <br /> with topsoil and seeded @ $1200/acre $ 9,720 <br />Phase III <br /> 5.4 acres to be sloped, graded, plated <br /> with soil and seeded @ $1200/acre $ 6,480 <br /> Construction of siphon system $15,000 <br /> 3200 linear f eet of pipe <br /> inlet and out let structures <br />Phase IV <br /> 6.5 acres to be sloped, graded, plated $ 7,800 <br /> with soil and seeded @ 51200/ acre <br />Phase V <br /> 17.6 acres to be sloped, graded, plated $21,120 <br /> with soil and seeded @ 51200/acre <br />Total reclamation costs $158,820 <br />United desires to submit financial warranty for phases I,II, and.III <br />until such time that phases IV and V are actually affected. <br />With this in mind, financial warranty for this amendment is calculated <br />to be $137,700. <br />9 <br />