Laserfiche WebLink
<br /> <br />2. Robinson will not commit to anythi setter than the Rules <br />and Regulations require. That is •1 .'for slopes above <br />water. I think we all have seen lives ock grazing in the <br />mountains on slopes that are at least 2h:ly. This is an <br />amendment to M-78-09 and as such we have revised the slope <br />grades. I think Robinson would rather not commit to a <br />definite slope but would rather state the slopes will be no <br />greater than 2h:ly this leaves them the latitude to make the <br />slopes 3h:ly if conditions are right. <br />3. Mr. Heifner did not recommend mulch in his reclamation plan <br />recommendation. After discussing this with Mr. Heifner he <br />said mulching the site was unnecessary on this site so we <br />lv will not commit to it choosing ~to stick with our experts <br />•~ •~ opinion. MLRB Rule 6.5 and CRS•32-34-116(1)(f) make it the <br />'~' final responsibility of the operator to insure a di- <br />~:' verse, effective and long-lasting vegetative cover that is <br />capable of self regeneration ...". This Robinson is <br />committed to doing. <br />4. We would prefer to stick with Mr. Heifner's seeding recom- <br />s.: ~• mendations. However; if the staff would like to give us a <br />L~ ~ written guarantee that their mixture will grow we will be <br />,• glad to use their seed mixture. <br />E <br />1. Some of the drainages will <br />overall direction of drainage <br />' ~, changed. The only time the <br />,~: drainages is during times of <br />): heavy rains. No design work <br />we donor know what problems <br />Robinson does not plan to <br />pattern on the site. <br />E <br />be affected by mining. The <br />in these drainages will not be <br />are is water flowing in these <br />runoff, ie after snowmelt or <br />has been done to date because <br />may arise in each drainage. <br />change the overall drainage <br />This is agreeable with Robinson Brick Company. Thank you. <br />Exhibit J Vegetation <br />Hr. Heifner says he used the Visual Estimate of Green Matter <br />meth~in determining the percentages of ground cover. T e very <br />s zi a of the affected lands made any other method impratical and <br />costly to the operator. <br />Exhibit 1 - Reclamation Costs <br />I will not argue with you on seed costs. Robinson Brick says <br />using your figures to calculate the bond at $48,000 is acceptable <br />and would like to request the bond be set at $48,000. <br />