Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 86Cr3567 <br />FAX: (303) 832106 <br />DATE: December 1, 2003 <br />TO: Jim Burnell <br />FROM: Joe Dudash D <br />RE: Bowie No. 2 me, Permit No. C-96-083, Bowie Resources Limited <br />Technical Revision No. 30, New Gob Pile, Adequacy Review <br />I am requesting your assistance in the adequacy review of TR-30 for the Bowie No. 2 <br />Mine. Bowie is proposing to construct a new gob pile to store, in addition to the normal <br />coal waste, the waste from the new wash plant that is currently being constructed. <br />Associated with this proposed gob pile will be a new sediment pond, a coverfill (spoil) <br />stockpile, topsoil stockpile, a haul road extension and ditches. I am requesting that you <br />review the issue of the gob pile leachate and the effects of the leachate on the ground <br />water system. <br />TR-30 was called complete on November 14, 2003. The adequacy review letter is due <br />December 15, 2003 (Monday). If I could get responses back from you by December 11, <br />2003, I would appreciate it. When you aze ready to review TR-30, please let me know <br />and I will get a copy of the submittal to you. Thanks for your help. <br />cc: Sandy Brown <br />c:/worl9/bowie2/tr30memo2 <br />OLORADO <br />( V I S I O N O F <br />INERALS <br />EOLOGY <br />:LAMATION•NINING <br />EAfETY•SCIENCE <br />Bill Owens <br />Governor <br />Greg E. watcher <br />Executive Director <br />Ronald W. Cottony <br />Division Director <br />Natural Resource Trustee <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />