Laserfiche WebLink
~EHVIRONM ENT, ,ING. - - - PAGE 3 ~~ . <br />' ':GEC'Ebt B`ER 23; 2005; - ~ ~ - <br />-_ ~~ <br />. - - :1 <br />armoring is needed `at-this time. As mining has moved north`on the, :, j <br />area west .of the Plant Site it is getting further=from the ri~rfr <br />andtno shoreline armoring-,will be needed until minicig is'done on ,,~ <br />the.southwestern -side of the Sharkey's -Lake area withn,the °,,~ <br />`Reservoir aea. A,number of old car:tiodies were used: to armor the , <br />north riiier bank in this area. The cars appear to`be from the- <br /> <br />- 1950's and. have survived, the 196.5 and 1973 flood§: They: have ' <br />provided adequate `protection for"this section and will. no"t be - <br />replaced in the future: we do-not .plan to mine within 150 feet <br />of the rise= in this area at thi§ time. I will begin to prepare , <br />a map showing the current armoring status along the tiger so'the <br />Division"and PS&G will have an idea of where armoring is needed and <br />where'it exists at this time. _ , <br />- 7: PSfiG submitted the Slurry WaT1.Desigm to the Division"for. review <br /> <br />and, approval on 12/7705. If approved the .slurry ,wall will be ' <br />' installed and no mining will take place within the fined .area until. , <br />the Construction :ind Engineers Certification is accepted by fhe <br />,Division -.and aci: appropriate .bond is submitted and accepted. ' <br />Publication of the: rehearing. began on 11/17/05 and the public <br /> <br />comment period ends '12/28'/05. ' <br />8, i concur with your arialysis up to where you added the cost of rip I <br />raping the,riyer. This is un-needed, at this time since the river <br />bank is armored next. to where mining is taking place and. it is ". <br /> <br />armored along the riverside, of the Siiarkey's, Lake. area. where the - - <br />I <br />slurry wall will be installed,: See Exhibit C-1=TR. At some time <br />we will need to install the reservoir side rip-rap but thap will- <br />,be aomeiime in the future. I think the bond should be $177,099.00'-. <br />or $177,100.00. To get this number i used your wo=ksheet anti took- <br /> <br />the riprap costs out and the recalculated the percentages basefl on I <br />.'$1;49,170 that is the total for-Task Numbers l thru 5. <br /> ^ <br />LIST OF ATTACHMENTS TO THIS RESPONSE: ,;' <br />Adequacy Figure TR-1' (corrected, and revised) <br />Sharkey Lake Mining Plaq Map ExhibA C-1 TR (revised) <br />Photos of armoring. referenced to Figure TR-1 (Figure TR-2) <br />I.hope these responses have addressed the adequacy,'questions-you <br />' had.' i will place a copy of this packet with-the Weld County Clerk of <br />the Board as required." If you have any questions please"call me. _, _~ <br />.Sincerely, <br /> <br />ronment, Inc <br />. E <br />n <br />i I <br />~w' <br />'''' <br />^ <br />~ I <br />Stevan L. O'Brian <br />- President. • <br /> 1 <br />ec Platte Sand.& Gravel LLC ~ ~ ~ ~ <br /> <br />file. ~ <br />enclosures <br />~ <br /> <br />r ` :~ <br />eta Y ' `~ ~ "'A'D-+M.' J ~ h , M .. .," .. d.~ 3~ `H.Y iA~tF.. P ! .~~ f ~ y "~-4 S E <br />~~~ <br />~' <br />