My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98367
DRMS
>
Back File Migration
>
Revision
>
REV98367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:29 AM
Creation date
11/22/2007 12:17:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/15/1996
Doc Name
RESPONSE TO PRELIMINARY ADEQUACY REVIEW MR 33 DISPOSAL OF COAL LOADOUT BASE MATERIAL SOUTHFIELD
From
ENERGY FUELS COAL INC
To
DMG
Type & Sequence
MR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />wumx.w mlrr • po.+ oMla Dw ua . tarw,o.. eobneo e+ne . p+al 7Nd~p6 <br />October 7, 1996 <br />Larry P. Routten <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. Colorado 80203 <br />III IIIIIIIIIIIII III <br />DECEIVE <br />OCT 151996 <br />AiVlRigf~ ul rdulpfUlO to 1,i001G~y <br />RE: Response to preliminary adequacy review <br />Minor Revision No. 33 (MR-33): Disposal of Coal Loadout Base Material <br />Southfield Mine, Permit No. C-81-014 <br />Dear Larry: <br />EFCI has reviewed the preliminary adequacy review of MR-33, and the issue concerning the proposed <br />burial of coal base material in the west ladout azea. EFCI believes that placing the base material within <br />the AVF azea with at least 4 feet of suitable material would not impact the potential of the site to support <br />flood irrigation. Given the approved postmining topography and location of the site, it is unlikely that <br />flood irsigation would be utilized in the future land use. <br />However, providing a demonstration of the potential impacts specified in the review would be time <br />consuming and unjustified. Per the Division's suggestion, and since there is adequate area to place the <br />base materials in the east loadout azea, EFCI is revising the plan accordingly. Figure 1, Loadout Area, <br />was submitted with the original application to show the relationship of the disposal sites to the Oak Creek <br />AVF area. This figure is no longer applicable and is eliminated by this reference. <br />Enclosed with this transmittal letter aze 3 copies of the following revisions to MR-33: <br />Summary of Revisions and Additions <br />Revised permit text <br />Please contact me if you have any questions or require additional information regazding the proposed <br />revisions. <br />Sincerely, <br />Energy Fuels Co I, Inc. <br />Allen S. Weaver <br />Mine Engineer <br />enc. <br />cc: G.V. Patterson (EFCI) <br />C. Cazey (EFCI) <br />T. Leidich (TersaMatrix) <br />
The URL can be used to link to this page
Your browser does not support the video tag.