Laserfiche WebLink
,--~ <br /> <br />GRAND MESA COAL COMPANY <br />PHASE 1 BOND RELEASE APPLICATION <br />1. Date of Request: March 14, 1989 & May 19, 1989 <br />2. Permittee: Grand Mesa Coal Company <br />743 Horizon Court, Suite 205 <br />Grand Junction, CO 81506 <br />3. Permit No.: C-81-034 <br />9. Mine Name: Red Canyon <br />5. Phase of Bond Release Requested: Phase 1 <br />6. Number of Acres: 610 <br />7. Bond Company: The Sumitomo Bank, Ltd. Chicago Branch and; <br />Safeco Insurance Company <br />8. Bond Number: Letter of Credit B/CGO 500015 and; <br />Bond No. 527 0929 <br />9. Current Total Amount of Bond: 5190,000 <br />10. Dollar Amount Requested for Release: 5113,458 <br />11. Legal Description of Area Requested: The entire Red Canyon <br />Mine Permit Area in Delta County which includes por- <br />tions of Section 2, 11; 12, 13, and 14 of T13S R95W of - <br />the 6th P.M. A more thorough descripticn is contained <br />in Volume I of Grand Mesa's Permit Application. <br />12. A Map Showing Area: Enclosed, Map No. 2.05.3(1)-1 <br />13. Dates Reclamation Work Performed: Reclamation Work was per- <br />formed August through November 1988. <br />14. A description of the results achieved as they relate to the <br />approved reclamation plan: <br />Grand Mesa notified the Division July 2Z, 1988 of <br />its intent to begin reclamation of the Red Canyon Mine. <br />Since that time all of the surface facilities at the <br />site have been removed and the majority of the dis- <br />turbed areas have been contoured, seeded and mulched. <br />This phase of the reclamation of the mine site was com- <br />plete by the end of November 1988. In accordance with <br />Rule 3.03.1(2) up to sixty percent of the bond amount <br />1 <br />