My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98344
DRMS
>
Back File Migration
>
Revision
>
REV98344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:28 AM
Creation date
11/22/2007 12:17:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/25/1998
Doc Name
FAX COVER
From
BATTLE MOUNTAIN GOLD
To
DMG
Type & Sequence
TR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1L•'"5"98 TEED 1~:J5 FeLY 71J BSJ 7209 BRIG HOIISTO~ f~002 <br />. . • . <br />a <br />Bdtie Mountain Gold <br />ANNE C- BALORIGF <br />VIC',£ PRESIpENi <br />ENVIRONMENTg1 qN0 GOVERNMENTg4 YFFgIR6 <br />BY FACSIMII.B <br />HARD COPY TO FOLLOW BY MAIL <br />November 25, 1998 <br />Mr. Mike Long <br />Director <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Deaver, Colorado 80202 <br />RE: BATTLE MOUNTAIN RESOURCES, INC. (BMRI) <br />SAN LUIS MINE, CMLRB PERMIT NO. M-88-1 ] 2 <br />Deaz Mike: <br />On November 16, 1998 BMRI submitted a revised Response Plan in accordance <br />with the requirements of TR-15. This Plan summarized the data and analyses conducted <br />to date to chazacterize the elevated total dissolved solids (TDS) levels previously <br />identified in monitoring well M-11R and the response measures, including interim <br />containment, which have been implemented by BMRI. The Plan also sets forth the <br />technical studies BMRI believes aze necessary to fully characterize the sturoundigg <br />hydm~eology in su$tcient detail to allow the evaluation and design of long term response <br />measures and establishes a schedule for their implementation. <br />BMRI would like to propose that an item be scheduled on the agenda for the <br />December Board meeting to allow BMRI and the Division to make a presentation <br />regarding the cturent understanding of the nature of the TDS problem, the interim <br />response measures in place at the site, and the schedule and approach outlined in rile <br />Response Plan for long term response measures. As we have discussed, it is BMR!'s <br />preference that the Response Plan be incorporated into an enforceable compliance order <br />and we therefore waive the required notice period as necessazy to accommodate a formal <br />public hearing to consider and approve a mutually agreeable order. <br />In this regard, we would request that we commence discussions regarding the <br />possible terms of such an order as well as working out any differences of opinion <br />regazding the elements of the Response Plan as soon as possible. Gives the potential for <br />399 CLAY STREET SUfiE A20D HOUSTON. 7E%IU 77002.6103 • 17131 6537228 FA% 1]197 6503636 TEI~c Tg9806 <br />
The URL can be used to link to this page
Your browser does not support the video tag.