My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98303
DRMS
>
Back File Migration
>
Revision
>
REV98303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:26 AM
Creation date
11/22/2007 12:16:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
8/26/2003
Doc Name
E-mail regarding Revision
From
Jim Stover
To
Joe Dudash
Type & Sequence
MR29
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 1 <br />Dudash,Joe <br />From: Dudash,Joe <br />Sent: Tuesday, August 26, 2003 8:50 AM <br />To: 'Jim Stover' <br />Subject: RE: New Gob Pile r~l R-a9 <br />It seems like a minor revision would be okay. However, it looks like the drill roads take off from <br />Old State Highway 133. Does Bowie need to get a permit from CDOT to do this? It also looks <br />like one or two of the proposed alluvial well locations may be within the right-of-way ofi Old <br />State Highway 133. Is this true? If the answer to both questions is no, you can submit the <br />request as a minor revision. If the answer to either one of the questions is yes, I would want to <br />talk to Sandy about this, due to the fact that it involves the public road. Please let me know. <br />-----Original Message----- <br />From: Jim Stover [mailto:jestover@bresnan.net] <br />Sent: Tuesday, August 26, 2003 7:52 AM <br />To: ]oe Dudash <br />Subject: New Gob Pile <br />Joe: <br />BRL needs to perform geotechnical drilling for the proposed new gob pile. The attached map shows the <br />road alignment and hole locations. We plan to install three new alluvial wells. All work will be on BRL <br />surface. Can this be handled as a minor revision? New roads are shown in green. Drilling will be on the <br />roads, no drill pads required. Approximately 0.9 miles of road required, 1.3 acres of disturbance. <br />Jim Stover <br />9!5!2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.