Laserfiche WebLink
' ~~~'Kok1 N+tA1T GARNAkA-J <br />c.~l?>< ~ R~rolza~2 <br />(L~P'r of ~ u ~ G- <br />January 9, 2005 <br />Mr. Bob Oswald <br />CDMG -Durango Field Office <br />701 Camino del Rio, Ste. 125 <br />Durango, CO 81301 <br />;air L ? P n n <br />c. _ <br />,LP,~;1 ~'„1,7., <br />c, -...- ~--~ <br />R~~`~Qd <br />JqN 2~ X0461 <br />,,,in'>r* ~1fi <br />HAND DELIVERED%S ~ G~°~' <br /> <br />~ ~ ~ <br />Re: Ignacio Pit, Permit # M-1992-1154,112(c) Conversion Application (CN-0~ - <br />Adequacy Review Response F~~~~ <br />Deaz Bob: ,/q~% /,~~0 <br />0%Yjy% ~ ~ 11~//L~ <br />Let this coaespondence, with attachments; serve as response to the adequacy rev4~bry;Qej -v{/ <br />comments. Responses are listed relative to the order of comments listed in your letter o~%ssA~~ep~ <br />December 21, 2005: ~' <br />Application page 1 (replacement na¢el <br />The total proposed mining azea within Phases A, B, C, and D is approximately 101 acres. <br />This includes the 9.9-acre existing 110 permit azea. The acreage listed on application <br />page 1 includes 39 acres of affected lands. This area is proposed to serve as a potential <br />aggregate planUequipment staging site. No mining will occur within this 39 acre azea (see <br />attached amended Exhibit C-Mining Plan map(EsJ-ibit C-In). <br />Exhibit C -Pre-Mining and Mining Maps <br />Separate maps have been prepared and are attached as amended Exhibit C-I and C-II. <br />All properties, easements and applicable structures within 200 feet of the affected lands <br />aze shown and identified on Exhibit C-I. <br />The mining limits are shown as Phases A-D on Exhibit C-II. The "affected lands" which <br />encapsulate the mining phases are shown on Exhibit C-I. <br />It is unknown at this time if mining will occur west of the buried irrigation line within <br />phases A and B. No changes to the mining limits shown on the original Pre-Mining and <br />Mining Plan map have been made. <br />Direction of mining for all phases is shown on Exhibit C-II. It is proposed that mining <br />will begin in Phase D at or neaz the proposed south access and progress northwazd. The <br />sequence of mnvng beyond this start up azea has not been determined. <br />Stormwater control assessment is further discussed in the attached addendum to Exhibit <br />G (Exhibit G - A). <br />