My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98219
DRMS
>
Back File Migration
>
Revision
>
REV98219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:22 AM
Creation date
11/22/2007 12:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995019
IBM Index Class Name
Revision
Doc Date
11/5/2001
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E}~-IIBI~, Mamie and Felix Mundell TrusTPit #32 <br />Mining Plan <br />a) the material will be moved by front-end loaders and wcks, a bull dozer will be used in <br />location where loader is impractical due to loose footing <br />b) the overburden will be moved by front-end loader and bulldozer and stockpiled <br />for use in reclamation <br />c) there will be no water diversions and impoundment's necessary at this pit, all <br />dikes and berms will be for safety and erosion control <br />d) the area to be disturbed at any one time will not exceed 10 acres <br />e) mining will start with ttus permit and continue sporadically during the years as required, <br />reclamation will be ongoing as the site is mined, the active area in the center will bt: <br />continued until exhausted, active mining will move [o West side of site and reclamation will <br />begin. Wes[ side will be mined going to the South in counter clockwise circle ending in <br />Northwest corner. Reclamation wtll proceed as mining moves in counter clockwise •circle <br />with topsoil stored on-site to be planted with native grasses with ground sloped 3:1 where <br />necessary <br />f) (i) material to be nuned is gravel and sand of varying depth with none to 3 ft of topsoil <br />overburden <br />(ii) straight below material is rock and will not be disturbed <br />g) the primary commodity will be gravel for use as road surfacing and the secondary <br />commodity will be clay for use as road bed materials <br />h) there will be no refuse, acid or toxic producing materials exposed during <br />mining <br />
The URL can be used to link to this page
Your browser does not support the video tag.