Laserfiche WebLink
STATE Off` COLORADO <br />DIVISION OF MINERALS AND GEOLOGY "~ ~ ` ~ - ~ ` ~ ~~.,~- <br />•Department of Natural Resources I I~ p+ q <br />Rn 4 1.yya <br />1713 Sherman SI.. Room 215 <br />Denver, Colorario 80203 <br />Phone: (3031866-3567 Iv •~t n1 rypgY.fma rv yr,~910 <br />rnx:l3ollalz-slob APPLICATION FORM FOR A REVISION' - 9. <br />TO A COAL MINING AND RECLAMATION PERMIT DEPARTMEN-I' OF <br />NATURAL <br />RESOURCES <br />This form must be completed and submitted with all requests for minor revisions, as defined in Roy Romer <br />Rule 1.041731, technical revisions, as defined in Rule 1.04(1361, and permit revisions, as defined covernur <br />in Rule 7.04(901. All revisions are to address the requirements of Rule 2.08.4. Three 131 copies Ea~~ s e o h~i d <br />of the revision, including maps, must be submitted in order for it to be complete. <br />Michael B. Long <br />Division Direaur <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal <br />date should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Western Regional <br />Coordinating Center (1999 Broadway Blvd., Suite 3320, Denver, CO 80202-57331, and proof of submittal <br />• to OSM must be submitted to the Division prior to implementation of the revision. <br />Permit No.: C- 8 0. 0 0 5 Date: 0 1/ 0 5/ 9 6 <br />Permittee: S E N E C A C 0 A L <br />- - - - - - - - - - - - - - - <br />C 0 M P A N Y <br />- - - - - - - - - - - - - - - <br />Street: 1 3 0 0 S 0 U T H Y A L E <br />- - - - - - - - - - - - - - - <br />- - - - - - - - - - - - - - - <br />City: F L A G S T A F F ______ <br />State: A ? Zip Code: 8 6 0 0 I _ _ - - <br />Brief Description of Revision: R E V I S E D_ T O P S O I L_ B A L A N C E <br />AND M I N E R A L O W N E R S H I P <br />I N F O R M A T I O N <br />Public Notice Attached: Yes _ No X (Required for PRs and TRs1 <br />Bond Increase: Yes _ No x Federal x Non-Federal _ Mine <br />Proposed Change in: <br />.Permit Area <br />(+/-1 <br />State Land (+/-) <br />m: \coal\share\forms\8865 <br />Disturbed Area (+/-) _ <br />0 0 Acres Affected Area (+/-) <br />0 0 Acres Federal Land (+/-) <br />0 0 Acres Private Land (+/-) <br />0 0 Acres <br />0 0 goes <br />0 0 Acres <br />