My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98100
DRMS
>
Back File Migration
>
Revision
>
REV98100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:16 AM
Creation date
11/22/2007 12:15:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982129
IBM Index Class Name
Revision
Doc Date
7/15/1997
Doc Name
L OTTO GOEMMER ROCKY FLAT GRAVEL M-82-129 RECLAMATION COST ESTIMATE SUMMARY
From
DMG
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br />DIVISION OF MINERALS AND GEOLCIGY <br />Deparimenl of Natural Resources <br />131 3 Sherman 51., Room 21 5 <br />Denver, Colorado P0203 <br />Phone: (3031 866 3567 <br />FAx: 13031 83?-A 106 <br />July 15. 1997 <br /> <br />STATE OF COLORADO <br />RE: L. Otto Goemmer-Rocky Flat Gravel-M-82-129, Reclamation Cost Estimate <br />Summary <br />II~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S Lochhead <br />Executive DireUnr <br />Michael B. LnnR <br />Division Dvecwr <br />This estimate is based on full extraction of the present permitted pit area and considering <br />reclamation work completed rn date. The work completed is grading of approximately''/z of the <br />2,228 linear feet of planned pit perimeter highwall and grading and topsoiling of these slopes. If <br />the slopes are redisturbed later, the bond could be adjusted upward. <br />TASK # TASK DESCRIPTION COST <br />1. Reduce pit hil;hwall to 3:1 grade 569.97 <br />2 Place 6 inches of topsoil over 2/3 of pit area 838.05 <br />3. Revegetate pit area (seed, seeding, fertilizer, mulch) 3,265.46 <br />4. Revegetate stockpile areas 2,063.02 <br />5. Fencing 17001.ft., assuming a north fenceline exists near <br /> north pit boundary, DOT cost data 1994 $1.15/I.ft. 1,955.00 <br />6. Mobilize/Dentobilize dozer and revegetation equipment <br /> from LaVeta 200.00 <br /> Total of direct Reclamation costs 8,891.50 <br /> Total indirect cost (18.5% of direct costs) 1,644.93 <br /> Total Reclamation costs 10,536.43 <br /> Administrative fee-Rule 4.2.1(5) 526.82 <br /> Total Reclamation Liability 11,063.25 <br /> Financial Wat7anty Amount (Bond) ] 1,050.00 <br />M.bss4ces.IJo <br />
The URL can be used to link to this page
Your browser does not support the video tag.