Laserfiche WebLink
HOWAM INC <br />Portland Plant <br />3500 Highway 120 <br />Florence, CO 81226 <br />719-784.6325 <br />Fax: 719-784-3470 <br />H O~N M <br />• iii iiiiiiiiniiiiii <br />999 <br />• <br />RECEIVED <br />MAR 2 1 2001 <br />Division of Minerals and GeoloAY <br />March 21, 2001 <br />Mr. Larry Oehler <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Stree[, Room 215 <br />Denver, CO 80203 <br />RE: File No. M-77-3~4 <br />Holnam Inc. <br />Technical Revision <br />Beaz Creek Crossing <br />Dear Mr. Oehler: <br />You are receiving this application for a Technical Revision to the Holnam [nc. Mining <br />Permit number M-77-006 as per your request from our meeting on Monday, March 12, <br />2001. <br />This technical revision is being submitted because the current mining plan needs to be <br />revised. The mining plan has been changed because a permit to relocate Bear Creek has <br />not been issued from the Corps of Engineers. Holnam needs to constrict a crossing <br />across Bear Creek instead of mining through the creek itself as previously planned. The <br />Corps of Engineers has approved a crossing over Bear Creek for development of a <br />mining road. As per your request this approval is included with this technical revision. <br />Included in this technical revision is the design for the crossing developed by Law and <br />Mariotti Consultants, Inc. the location of the crossing, and the mine plan far mining on <br />the eastern side of Bear Creek. <br />