My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98035
DRMS
>
Back File Migration
>
Revision
>
REV98035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:14 AM
Creation date
11/22/2007 12:15:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/3/2003
Doc Name
Letter & Application
From
J.E. Stover & Associates
To
DMG
Type & Sequence
MR65
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...L :- 'a <br />-2- <br />Special Conditions: <br />1. The conveyor tube will be cleaned completely of coal <br />residue prior to dismantling to prevent coal particles <br />from entering the Colorado River. <br />2. Coal residue in the sections of the tube which are not <br />possible to clean, will be contained in place prior to <br />the temporary placement of the tube sections into the <br />river. <br />3. The applicant or his agent shall inform the <br />construction workers involved with this project about; <br />,. <br />permit conditions and the need _to minimize disturbance ~ _. <br />within the channel. <br />4. Oil or fuel servicing. of vehicles and equipmezit must -.-.. <br />not be performed within the channel of the river to - . <br />ensure that spills do not occur in waters of the U.S. <br />Such se=vicing shall be performed outside of the _''-- <br />channel in a.manner which-will prevent contamination :o£-___:::' <br />_ <br />the river should .a spi1L occur.- _ - - =-: - --=-•= - - <br />_..~._. <br />5. All contours of the channel-shall be returned to.its ~.: '_ <br />previous conditions, and any excess material .shall be :.- ..-, <br />removed from the river channel. The channel and its <br />bank shall be left in a stable condition. Vegetative <br />disturbance along the top of bank and sides of the bank _ <br />shall be compensated with transplanting and seeding. <br />This verification is valid until November 25, 2005. If you <br />have not completed your project by that time, you should contact <br />the Corps of Engineers to obtain information on any changes which <br />may have occurred to the nationwide permits. You are responsible <br />for remaining informed of such changes. <br />we have assigned number 200375373 to your project. Please <br />refer to this number in any correspondence with this office. If <br />you have any questions, please contact Mr. Nick Mezei of this <br />office or telephone number 970-243-1199, extension 13 or email <br />nick.mezei@usace.army.mil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.