My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97956
DRMS
>
Back File Migration
>
Revision
>
REV97956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:10 AM
Creation date
11/22/2007 12:14:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
2/23/1999
Doc Name
APPLICATION FORM FOR A REVISION TO A COAL MINING & RECLAMATION PERMIT
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - _-- - - - III IIIIIIIIIIIIIIII <br />COLORADO DIVISION OF 1VIINERALS All„ v~vl,ul;Y <br />•.~ ~ ,• 1313 Sherman Stteet, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />RECEIV <br />APPLICATION FORM FOR A REVISION FEg 23 1999 <br />TO A COAL MINING AND RECLAMATION PERMIT Geo1o9Y <br />pivis~on of M~netais ~ <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule <br />1.04173), technical revisions, as defined in Rule 1.04(1361, and permit revisions, as defined in Rule 1.04(901 <br />All revisions are to address the requirements of Rule 2.08.4. Three (31 copies of the revision, including <br />maps, must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, <br />maps, tables andlor figures, with a revised table of contents, if necessary. The revision submittal date <br />should be printed in the lower right corner of each revision page. A cover letter to the revision should explain <br />the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list (except OSM) at the same time the application is submitted to the Division, and proof of distribution must <br />be submitted to the Division along with the application. Copies of revision pages modified during the review <br />process must be distributed in the same manner, along with proof of distribution. Proof of distribution must <br />be submitted prior to implementation of the revision. <br />Permit No.: C - ~ - D I Z Date: 0 2_ / 1 ~ / ~`~ <br />Permittee: P:clLr.ti,,.r:ra ~roc~ss),~,. LLG <br />Street: 13 U t-1.r~,~,t ,.i o.. 2 ~ ,- ~ r c <br />city: E~....~~~-~~ <br />State: ~ N Zip Code: 4'- ~ tl - <br />Brief Description of Revision: R ~~,. ~ i ~ o ti = .. (-F-., d ro I e ~) ~ <br />frtunlt'Ot)/1N <br />Public Notice Attached: Yes ~ No _ (Required for PRs and TRsI <br />Bond Increase: Yes _ No 1~ Federal _ Non-Federal _ Mine <br />Proposed Change in: <br />Disturbed Area (+/-) - _ D , _ Acres Affected Area (+/-) _ _ O . _ Acres <br />Permit Area (+/-) _ _ 0 . _ Acres Federal Land (+/-) _ _ a . _ Acres <br />State Land (+/-) _ _ D . _ Acres Private Land (+/-) _ _ 0 • _ Acres <br />m: \co al\sh a re\f o rm s\886 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.