<br />• Itpound~ent Leakage <br />The MLRD has expressed concern that excessive leakage will occur <br />recirculating pond. Some leakage is inevitable. However, it ap) <br />will be minimal. It is anticipated that the pond bottoms will be <br />self-sealing. The fines and sediments will settle out of the mie <br />drop to the pond floor. The existing material that was removed i <br />bottoms was laboratory tested and Eound to be a low plasticity c] <br />type which typically exhibits low permeability. Permeability tee <br />conducted on the material, since it had already been disturbed. I <br />this disturbance, lab tests will not yield a reliable approximate <br />will occur in the field. <br />• Operating Level/Freeboard <br />The maximum operating level of the mine operations will be maint <br />three feet below the crest of the pond embankment. Three feet o <br />substantially more than is required to contain the 5-year, 6-hou <br />from the area tributary to the pond embankment. However, the th <br />figure is held to be reasonable in view of embankment stability, <br />and emergency surcharge reasons. As demonstrated in a prior rep <br />amount of runoff over the 150 acre contributory xatershed above <br />is approximately 1.1 acre feet in a 5-year, 6-hour storm event. <br />estimated 800 foot by 200 foot water surface area, the storm eve <br />less than one foot of depth in the ponds, leaving over two verti <br />freeboard. <br />ONSITE DRAINAGE <br />MLRD has expressed concern that not all of the mine slte will ac <br />to the recirculating ponds. A slope study was performed which v <br />all drainage form the mined area in Phase I will flow into the 1' <br />Topography considerations make it virtually impossible to have t. <br />permit area drain into the ponds, and it only necessary to contr <br />the disturbed areas. RunoFE from the disturbed area will be der <br />ponds. When the latter stages of the mine plan are reached, new <br />probably will be required and they will be sized and sited at th <br />Minor sedimentation ponds will be used to collect runoff xaters <br />necessitated by the topography. <br />EIVEH FLOODING <br />MLRD has expressed concerns that embankments in the mine site ma <br />endangered from the 25-year flood of the Middle Fork of the Sout <br />River. As stated in a previous report, the river has a 33.3 squ <br />watershed. This was calculated from the USGS 1:250,000 scale ma <br />includes all areas tributary to the South Platte from its crossi <br />Highway 9 and just south and east of Alma. The 25-year flood wa <br />regression analyses developed by the United States Geological Su <br />:rom the <br />gars that it <br />essentially <br />water and <br />•om the pond <br />iy (CL) of a <br />:s were not <br />cause of <br />~n of what <br />ned at least <br />freeboard is <br />storm runoff <br />e Eoot <br />ave action <br />t, the <br />e mine area <br />even the <br />occupies <br />1 feet of <br />drain <br />that <br />entire <br />runoff from <br />tad to the <br />time. <br />be <br />Platte <br />e mile <br />ing and <br />under <br />based on a <br />er. The 25- <br />3 <br />