<br />RESPONSE TO <br />MINED LAND RECLAMATION DIVISION <br />HYDROLOGY CONCERNS AT THE <br />ALMA PLACER MINE <br />Memos have been issued by Mined Land Reclamation Division (NERD) ndicating <br />concerns regarding pond embankments that will be used to contain he <br />recirculating rater for the Placer mining operation. In response to these <br />concerns from the MLRD, pond embankments have been altered in the field, and <br />office reassessment has been performed. Field work is continuing and minor <br />differences may occur from estimates contained herein. <br />~u~i:f?~'~~ <br />•~ 9lstory <br />A brief history of the embankments is useful information. The pc <br />embankments present in the Field today have a core embankment the <br />place for over 50 years. The relatively small historic embankmer <br />by several mining operations over the years. Usage of the ponds <br />mine raters upstream of the embankment and fine materials, i.e., <br />clays, (also known as slimes) settled into the bottom of the pond <br />indicate that these fines xere bulldozed out of the pond bottoms <br />on top of the historic berms. Some of this material slid down tt <br />slope of the resulting embankment and impinged on some vegetation <br />of the embankment. This raised the ire of regulatory agencies, a <br />applicant was directed to remove the material From the vegetation <br />this goal, bulldozers were used to pull the downstream face of tt <br />embankment up the slope and discharge it into the impoundment ere <br />in order to clear the downstream toe. Additional concerns Erom t <br />the time this operation was taking place resulted in more extensi <br />evaluation and reconstruction. <br />As a result, the downstream face of the modified historic embank <br />cleaned to within zero to three feet of the apparent original gr <br />The material was then replaced in approximately 12 inches loose <br />compacted using a vibrating sheet roller. The downstream slope <br />reconstructed in a slope of 3 horizontal to 1 vertical as shown <br />The earthwork movement became so extensive, that the removal and <br />effort was repeated For the upstream Face of the embankments as <br />downstream face. <br />• Soils Data <br />As discussed above, the embankment section has been extensively <br />that which previously existed. Soils tests were performed on th <br />embankments and the material was found to fall into two classifi <br />SM and CL. The clay soils (CL) are relatively limited in extent <br />be the slimes that were pushed out of the pond. For the most pa <br />has been in <br />s were used <br />mpounded <br />ilt and <br />Reports <br />nd pushed up <br />downstream <br />at the toe <br />d the mine <br />To achieve <br />loose <br />temporarily <br />e MLRD at <br />e embankment <br />ants has been <br />and level. <br />ifts and <br />Plate lA. <br />mpaction <br />1 as the <br />evised from <br />disturbed <br />ations, SW- <br />and appear to <br />t, a <br />1 <br />