My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97822
DRMS
>
Back File Migration
>
Revision
>
REV97822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:04 AM
Creation date
11/22/2007 12:13:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
2/2/2005
Doc Name
Proposed Decision & Findings of Compliance
From
DMG
To
File
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
('ritcria ~u~d Schedule fire littntl Release <br />Rule 3.IL+.II'-)(a) states, "l p to silty 160) percent of the applicable bond amount shall he <br />rcleaxd ,+hen the perminee successfully con+plrtes hackl filling, regrading, and drainage control <br />in accordmtcc with the approccd reclamation plan," Rule ..U;.I(2)(dl alx~ restricts the Division <br />from reducing the hand to an amount less than what is necessary to complete the remaining <br />reclamation work at the site.:\n accuunline of both the hood dollars invnhed and the arms <br />applicable to this Phase I bond rele:ue Iblluws hrluty. <br />Acrea~ Accounting <br />The acreage subject to this parti;d Phase I bond release is I _~.I acres. At the present tints. I ~ ~.R <br />acres have been disturbed by activities aI the Lorencito Canyon \iinr. fhe arras arc desc:ritx:d in <br />Lahle_.U>.-1-Ifuf the permit and shown on \1ap?.OS,±-i tioil ti;;mplr Locution and tioil <br />Distribution Plan, \1ap _'.n5. +-6 Soil Borcow meas. and Map ~.Oi. ;-?, i-Year \4ine !'Ian. l~he <br />hreakdotvn of these acres i as described in 1lthio A t,rlow: <br />able ;1 <br />Are:+ <br />rel:.ur Itl.-tl <br />lu hr rcwlumuYl m the tulurr <br />i Iu_f~c rcc:ai+r+cd m the tinurt <br />uta i3 -- - ' ' 1'rutectrtl for disturbance in ~UUS _ <br />_~ _ ?_ . Sturu'r tr.+ilrr+h, remain for P~tl.l' <br />ei~s4 nwds ~ ? 1.8 Approt rd :+.,prrnrtnem but not utcl <br />Topsoil horrmv urea ~3 t'_.7 acres) ttas approved li+r disturbance as a result of Technical <br />Revision kl?. At the time ul the prolx,sed decision for this ixtttd release 151.-011. this topsoil <br />fwrmw area had not been disturt,rd. 1 iowrvrr, these activities are projected to be completed in <br />20(1? durinE a,psuiling operations un the surt:,rr minx area. <br />hand/Reclamation ('ost I~stimate Accounting; <br />Ibis action describes the process and calculations ti,r the drtcnninatiun of the anu,unt of ix,nd <br />p) hr nlcasrd and ru+nvrnrl}•, results in the drtrnnination of the required :unount of hood to hr <br />held by the Division ac a result of this bond release 15L-011. <br />the redamation rust estimate and required hand amount tbllowing approval of Technical <br />Revision ~ 13 (I'R- I ; I is b?.-176.076.00. The amount of hand ;aligned liar hacl.lilling and <br />eradine tasks liu the 122.1 acres include) in this Phase I hood release is SI?+)9,A'_R.00. <br />Including costs associated with liability insurance, contractor, performance Mmd, job <br />
The URL can be used to link to this page
Your browser does not support the video tag.