Laserfiche WebLink
followed in the recent Phase 1 bond release application, and was accepted by the <br />Division. <br />In various sections of Appendix 13-13, as proposed within TR-40, the narrative is not <br />consistent with this approach and will need to be properly amended for consistency with <br />Exhibit 13-13.1 and the Phase 1 bond release application. We have identified below the <br />sections which need to be amended, and we have included suggested wording that would <br />appear to be consistent with the approach delineated on Exhibit 13-13-1 and in the <br />recently submitted Phase 1 bond release application. <br />Block descriptions at the top of page 13-13-2 will need to be amended for consistency. <br />BRB-1 should apparently be described as "lands mined prior to August 3, 1977". BRB-2 <br />should apparently be described as "lands mined and reclaimed between August 3, 1977 <br />and September 21, 1981". BRB-3 description appears to be appropriate, as does <br />description for BRB-4 and BRB-5. <br />Narrative at bottom of page 13-13-5 and top of page 13-13-6 will also need to be <br />amended for consistency. 2nd sentence of final pazagraph of 13-13-5 should probably <br />refer to "pre-law lands mined prior to August 3, 1977 (BRB-1)". 3`d sentence of the <br />pazagraph beginning on 13-13-5 and continuing on 13-13-6, should probably refer to <br />"lands mined and reclaimed between August 3, 1977 and September 23, 1981..." . <br />Please review the text of Appendix 13-13, and revise as appropriate, to ensure <br />consistency with Exhibit 13-13-1 and the Phase 1 bond release application. <br />4. The text regarding one year of sampling required in BRB-1, and 2 years of sampling for <br />other bond release blocks was amended as requested; the response is satisfactory. Item <br />Resolved. <br />