My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-23_REVISION - M1979165
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979165
>
1996-07-23_REVISION - M1979165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:21:19 PM
Creation date
11/22/2007 12:11:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979165
IBM Index Class Name
Revision
Doc Date
7/23/1996
Doc Name
TR BROMLEY PIT FREI PIT 3 MLRB PN M-79-165
From
ALBERT FREI & SONS INC
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • EXHIBIT L <br /> RECLAMATION COSTS <br /> This reclamation cost estimate in based on the assumption <br /> that there will be no more that 13.00 acres ± disturbed at any <br /> one time. The following information also depicts a worse case <br /> scenario. At that time we will have to respread 18,279.07 cubic <br /> yards of topsoil on 11 .30 acres, shape 9 .43 acres prior to <br /> resoiling and revegetate 13 .00 ac. ±. The amount of topsoil that <br /> will be re-spread is based on an average of 12 inches. A 631D <br /> motor scraper will be used to do all of the topsoiling work and a <br /> D-9 dozer will be used to shape the area. These figures are then <br /> used in the calculations for the bond amount. The revegetation <br /> cost figure includes fertilizer, grass seed, mulch and drilling <br /> costs. <br /> STAGE TOTAL SOIL DEPTH <br /> NEEDS RESOILING 11 .33 121, <br /> NEEDS SEEDING 13 .00 <br /> GRADING AND SHAPING 11 .33 <br /> RESOIL @ 12 " 18,280 CUBIC YARDS <br /> ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS. <br /> Unit Cost <br /> 1 . Revegetation includes grass seed mix and <br /> labor to drill . . . . . 500.00/AC. <br /> 2 . Re-spreading soil and/or growth media with <br /> 631D Motor scraper haul distance 3500 . . . . . . . 0.44/YD' 1/ <br /> 3 . Site grading and shaping <br /> D-9 cat, push distance less than 50 . . . . . . . 240.00/ac ?/ <br /> RECLAMATION COSTS <br /> 1 . Revegetation, 13 .00 ac @ $500.00/ac $ 6,500. 00 <br /> 2 . Resoiling, haul distance 3500 feet, <br /> 18,2803 .33 yd3 x $0.44/yd3 8, 042 .79 <br /> 3 . Site grading and shaping <br /> 9 .43 ac. x $240.00/ ac 2,263 .20 <br /> Net Total $16, 805 .99 <br /> 5 . Indirect costs <br /> Mobilization 504. 18 <br /> Insurance, Bond, 6 Profit 2, 104 .95 <br /> 6 . Administration costs 840.30 <br /> TOTAL ESTIMATE 20,255 .42 <br /> RECOMMEND BOND REMAIN AT $20,500.00 <br /> 1/ Figured using Cat Handbook and rental costs from local sources for 83% <br /> efficiency, 631D scraper, for eastern Colorado. <br /> 2/ Figured using Cat Handbook and rental costs from local sources for 83% <br /> efficiency, D-9 dozer, for eastern Colorado. <br />
The URL can be used to link to this page
Your browser does not support the video tag.