Laserfiche WebLink
<br />ESTIMATING FORM - <br />_________________ RE VEGETATION WORK <br />__________________ cone d Filename M004-9 <br />________ sheet 2 of 2 <br />H. SHRUB fi TREE TRANSPLANTS' <br />_________________ ___________ MATERIAL: PLANTING: $/PERT. ~ TOTAL TOTAL <br />SPECIES NAME QUAN./ACRE STOCK TYPE 6 SIZE $/PLANT S/PLANT PELLET $/PLANT $/ACRE <br />Bare Root Tree 80 [ubling $0.90 $0.05 I NA $O.aS 5]6.00 <br /> Total cransp la nt cos[/acre: 536 .00 <br />C SEEDBED PREPARATION ~ ____°___ ____ <br />Tilling method pl chisel plowing • 553 .95 <br />p2: <br />__________________________________________________ <br />______________________ <br />___________ <br />D. SEED APPLICATION To Cal cos[/acre: $53 .95 <br />____________________ <br />Seed rng method: <br />drill seeding <br />Total <br />cos[/acre: <br />$60 <br />.23 <br />E. FERTILIZING <br />______________= FERTILIZER / SOIL AMENDMENT UNITS/ACRE UNIT 5/UNIT $/ACRE <br />Ma[eria is used pl: 10-39-0, 18 96-0, 5-10-8 • 200.00 pound 50,20 $40 .00 <br />p2: <br />p3: <br /> Total ma [er is is cos[/a Cre: $40 .00 <br />Appl icac non method ql: hand he ltl broadcas[ Spreader • 5101 .63 <br />p2: <br /> Total application cos[/acre: $101 .63 <br />F. MULCHING " "_-__ __ <br />____________ <br />MULCH / NETTING / OTHER MATERIALS <br />UNITS/ACRE UNIT <br />5/UNIT <br />$/ACRE <br />Ma[enals used ql: No mulch materials required $0 .00 <br />pz: I I I I <br />p3: <br />p9: <br />- <br />======== <br />=====x==_= <br />==_ <br />__ <br /> ___________________________________ ________===== <br />______ ______________ _ =-= <br />======__ <br />c <br />Total mat er [a l_ <br />cost/acre: _____ <br />$0 __ <br />.00 <br />Appl ica[[on method pl: No mulch applica[ion required 50 .00 <br />q2: <br />p3: <br /> Total applica nor cost/acre: 50 .00 <br />G. SOB COST -------- ---_ <br />Total area to be seeded : 28.50 acres. total $/acre 5727.41 Total Ini[ia1 Job Cos[- 59,21"1 .32 <br />Es[ima Ced failure ra [e : 25 004 of area. Total 5/ac re• $323.41 Total Res e[di ng Costs - 52,309 .33 <br /> • Reseeding cas[ i[ems: A B C D E GRAND TOTAL JOB COST - ~$11, 521 .65 <br />