Laserfiche WebLink
<br />ROADABLE EQUIPMENT: <br />__________________ <br />Machine Description <br />MOB/DEMOB SUPPORT EQUIPMENT: <br />Non-ROdda ble Eqp. Descripcron <br />Roadable Eqp. Description <br />To cal Eap. F1eec Size Haul Trip <br />Cost/hr Ino. ha uledl Cost/hr <br />she e[ 2 of 2 <br />Re [~irn Trip <br />Cost/hr <br /> $ub[ota is 50.00 <br />_________ 50.00 <br />__ ______ <br />Weight Ormership Haul Rig Elee[ Size Haul Trip Recu rn Trip DOT Pe rmi[ <br />Icons) Cosc/hr Cost/hr (no. hauled) Cost/hr Cosc/hr Cost/ea <br />__________ ______ _ <br />Subtotals <br />50.00 <br />50.00 $0.00 <br />Total Eqp. Fleet Size Haul Trip Recu rn Trip <br />Cosc/hr Ino. hauled) Cost/hr Cosc/hr <br />Subtotals <br />EQUIPMENT HAUL DISTANCE fi TIME <br />Nearest major city or [own within pro) etc area region: Golden <br />Total one way travel distance = 10.0 miles. Average cra vel speed = <br />Job Time Non Roadable Equip.- 0.50 hours load Roadable Equip.- <br />0.33 hours haul <br />0.50 hours unload <br />0.33 hours rec urn <br />SOB COST <br />Total Mob/Demob Cos[ = 51,258.8] <br />$0.00 50.00 <br />30.00 mph. <br />N/A hours load <br />0.33 hours haul <br />N/A hours unloatl <br />0.33 hov rs n:[urn <br />NOTE: Non roa dable equipment (haul rig required [o transpor[1 mob/demob costs based on 2 round cups, each [rip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equ ipme nc Ino haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on cerca in <br />speciEietl road segments within the State. Se pa race permits are required for each rrg on each loaded trip. <br />Addic Tonally, pilot cars lone or two per rrg depending on degree of oversize) are also n:qurred for oversize <br />equ ipmenc hauling, and loading/unloading times must be increased subs [an[ially for equrpmenc which must be <br />pa r[ially dismantled for tra nspor[ and re-assembletl ac the job site. Costs Eor lifting equrpmen[ and ocher <br />s upporc equipment needed for [his work should be included in the mob/demob costs. <br />