consideration. <br />Item 39: Satisfied. Thank you for your response. <br />Item 40: The seed mixtures located in Table 33 for both Final and <br />Temporary uses are still too heavy. For the temporary mix, the <br />Crested Wheatgrass could be reduced from four pounds of pure live <br />seed (PLS)/acre to one pound PLS/acre. The rest of the temporary <br />mix is satisfactory. For the final mix, please reduce your amounts <br />on all species by one-half, providing a 49 PLS/sq.ft. instead of <br />98. Generally, 35-50 PLS/sq.ft. is the targeted and desired <br />seeding rate. Thank you for your responses. <br />One note: There have been several misspelled words found on Table <br />33. These are the following: <br />1. Crested wheatgrass should be Agropyron desertorum <br />2. Bouteloua curtipendula <br />3. Astragulus cicer <br />4. Bouteloua (wherever mentioned) <br />5. page 2.05.4-22R: 1st paragraph, 1st sentence: "a <br />damping"- please clarify. Perhaps you mean "adapting"? <br />Please correct these items. <br />Items 41 through 47: Items concern bonding issues. Please refer <br />to the bonding memo and our discussion on August 11, 1993 <br />concerning some inaccuracies by ACZ in their bond calculations. <br />For the record, issues that need particular attention are: <br />1. Maximum payload vs rate cubic yard volume payload; with an <br />average of scraper 17 cy. Therefore, all earth-moving <br />calculations need to be re-estimated. <br />2. Scale adjustment for contractor performance bond, public <br />liability insurance (1.55$), contract preparation fees, <br />Division's project management fees and job superintendent fee <br />all need to be re-adjusted from the submitted estimate. For <br />assistance, refer to copy of scale provided August 11, 1993 on <br />site meeting. <br />3. No cost to remove pond lining for Pond #`3 was calculated. <br />Please include this in your final bond submittal. <br />4. Concrete and foundation removal costs, including <br />preparation plant costs need to be re-estimated. Please see <br />memo dated August 6, 1993. <br />5. Is the bond amount set for 500,000 or 100,000 tons at the <br />loadout? <br />6. Portal sealing is estimated by Means at $9.61/sq ft for <br />installation of the concrete blocks. Therefore, this item <br />needs to be re-estimated also. <br />7. The loadout calculations need to be based on what is <br />currently committed to in the permit, ACZ estimate is short. <br />Refer to the memo dated August 6, 1993 for details. <br />8. Page 15, mobilization costs need to include fuel and Tube <br />trucks or a pilot car, with the addition of the cost of a <br />tractor trailer combination adjustment from $108/hr vs <br />$64.30/hr. <br />9. Revegetation: include transplants of live trees and <br />