My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-06_REVISION - C1996084 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2007-11-06_REVISION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 9:21:57 AM
Creation date
11/22/2007 12:11:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
11/6/2007
Doc Name
Review Letter (Memo)
From
Kent Gorham
To
Jim Stark
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iroteroffice <br />MEMORANDUM <br />to: Jim Stazk <br />from: Kent Gorham <br />subject: SL-02, Lorencito Canyon, Industrial Bond Release <br />date: November 6, 2007 <br />Jim, <br />I need to ask for your assistance for modifying the Lorencito cost estimate for SL-02, Industrial <br />Land Use bond release. As I mentioned to you, TR-14 changed the land use to industrial and <br />included some bond reduction due to a change in the reclamation plan. The azea for industrial <br />use, and final bond release, is 12.5 acres and includes the Lorencito haul and access road, the <br />office azea, the Jeff Canyon haul road from the Lorencito intersection to the disturbed azea, and <br />the coal loadout. <br />I have reviewed the application and have identified the tasks and costs that I think aze eligible for <br />release. It differs somewhat from the operators request for reasons yet unknown. The estimate is <br />part of the permit (Exhibit 23) and I will need a number of pages modified. Here's a spread sheet <br />of what I think is eligible. <br />SL-02 Industrial Bond <br />Release <br />Task Comments Cost <br />4 load and haul bed coal 7551 <br />8 rip JC TS base 3333 <br />13 grade JC TS area 504 <br />20 regrade ditches at LO 3867 <br />37 replace TS to service area 359 <br />58 TS to LO (TR-14 got it all) 0 <br /> hydro seed steep <br />70 embankments 10582 <br />71 broadcast JC TS piles 9017 <br /> Seed LO(TR-14 got most of <br />72 it) 751 <br />82 clean LO sed pond 8040 <br />101 regrade LO 600 <br />102 replace TS to berm 2196 <br />TOTAL 46800 <br />I have asked Lorencito to reclaim the sediment pond at the loadout. I have also asked why they <br />included $25, 974.00 in their request. And finally, I need to verify that they hydro-seeded the <br />Jeff Canyon steep road embankment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.