Laserfiche WebLink
Mazch 2000 -iii- 993-2099.150 <br />• LIST OF TABLES <br />Table 1 Statistical Precipitation Data <br />Table 2 Evaporation Data Used to Represent the Cresson Project <br />Table 3 Depth To Bedrock From Underground Workings Drilling Program <br />Table 4 Phase IV Diversion Parameters and Hydraulic Structure Sizing <br />LIST OF FIGURES <br />Figure 1 Phase N Ore Grading Plan <br />Figure 2 Phase N VLF Cross-Sections <br />LIST OF DRAWINGS <br />Drawing 1 <br />Drawing 2 <br />Drawing 3 <br />Drawing 4 <br />• Drawing 5 <br />Drawing 6 <br />Drawing 7 <br />Drawing 8 <br />Drawing 9 <br />Drawing 10 <br />Drawing 11 <br />Drawing 12 <br />Drawing 13 <br />Drawing 14 <br />Drawing 15 <br />Drawing 16 <br />Drawing 17 <br />Drawing 18 <br />Drawing 19 <br />Drawing 20 <br />Drawing 21 <br />Drawing 22 <br />Drawing 23 <br />Drawing 24 <br />Drawing 25 <br />• Drawing 26 <br />Drawing 27 <br />Phase IV Title Sheet <br />Phase IV Existing Valley Leach Facility Site Conditions <br />Phase N Site Geology Map <br />Phase IV Known Undergrotmd Workings <br />Phase IV Site General Grading Plan <br />Phase N Valley Leach Facility Cross Sections <br />Phase N VLF Sections and Details <br />Phase IV PSSA Layout and Details <br />Phase IV PSSA Sections and Details <br />Phase IV PSSA Berm Sections and Details <br />Phase IV PSSA Riser Design <br />Phase N High Volume Solution Collection Piping Layout <br />Phase N High Volume Solution Collection Details <br />Phase N Low Volume Solution Collection Details <br />Phase N Underdrain Details <br />Phase IV Leak Detection and Erosion Control Details <br />Phase N Operations Watershed Subbasin Delineation Map <br />Phase IV Surface Water Diversion Plan and Profile Sheet 1 of 4 <br />Phase N Surface Water Diversion Plan and Profile Sheet 2 of 4 <br />Phase IV Surface Water Diversion Plan and Profile Sheet 3 of 4 <br />Phase IV Surface Water Diversion Plan and Profile Sheet 4 of 4 <br />Phase N Surface Water Diversion Details Sheet 1 of 2 <br />Phase IV Surface Water Diversion Details Sheet 2 of 2 <br />Phase N External Pond Plan and Details <br />Phase IV Ore Depth Isopach <br />Phase N Critical Stability Plan and Cross Sections <br />Phase IV Post Closure Watershed Subbasin Delineation Map <br />I:\99110991FlNAL REPORl12099MA1N3.DOC Golder Associates <br />