My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97585
DRMS
>
Back File Migration
>
Revision
>
REV97585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:54 AM
Creation date
11/22/2007 12:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
8/9/1996
Doc Name
YOAST MINE PN C-94-082 POND 10 CONSTRUCTION
From
SENECA COAL CO
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 09 '96 12~24PM PEABODY WSTN SENECA MINE <br />P.5 <br />drainage bleaker and toe drain be rnoctruaed. The plans call for a 6-inch diameter pipe be <br />placed in rho too drain. We recommend that the pipe consist of perforated PVC pipo meeting <br />the roquiremeats for Schedule 30:14 is accordance with ASfM. The free draining gravels [o <br />be used in the tce drain should meet the aper~5catioas outlinod on page 13.3-1i of the <br />apecificatioas for the toe drain materials. We would also recommend that the same free <br />draining materials be used for the drainage blanket, It u our understanding Wet Cornell <br />Resources, in Milner, Colorado, is presently producing a washed aggregare material which <br />would meet this specifieatioa. The pleas call for We drainage blanket to be a minimum of 1 <br />loot thick; however, we would reeoatmmd that the drainage blanket be a minimum of 2 feet in <br />thiciotess. In addition, we recommend that We toe drain sad drainage blanket be wrapped, <br />'sop and bottom, wiW Mvafi 140N or as equivelmt product. The base of the embaakmeol, <br />below We drainage zystem should be underlain wiW Mvafi 140N and not We 50f1)i. <br />a} A stability analysis of the embankment s[ruaure has ao[ been completed For this project. <br />Therefore, basod on our eoaversation wiW you, ow fum will complete a stability analysis for <br />this atruaurc using SB-Slope sad the slope ronfgurations shown on the project pleas. It is <br />our understandutg the[ the fill materials to be placed in the embankment will come from the <br />cv[ slopes being consvuc[ed for Haul Roads Y-B and Y-A. We will use the [rialdal shear <br />strength information obtained earlier oa these materials for the embankment fill materials. <br />The results o[ rho stability analysis will be forwarded to your office as soon as they are <br />wmpleted. <br />I.f you haw any quosti~its rCgBTdlag this letter, our observations or recommmdatioas or if we may be of <br />further service, pie contact this office. <br />Sincerely, <br />1NC., <br />Brian L. <br /> <br />)oe No. 45.73&1 Norihvcs[ talorado Conaulunts, Inc. Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.