My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97552
DRMS
>
Back File Migration
>
Revision
>
REV97552
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:53 AM
Creation date
11/22/2007 12:10:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Revision
Doc Date
3/16/1983
Doc Name
COTTERS COMMENT RESPONSES SET FORTH BELOW ARE ADDRESSED TO THE MLRB COMMENTS TRANSMITTED TO COTTER B
Type & Sequence
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />McArdle Comment F.1. <br />• "This map portrays the entire site of the project as being recontoured <br />with all historical drainage patterns reestablished with the exception <br />of drainage onto the waste dumps. All proposed diversion structures and <br />energy dissipation structures must be clearly portrayed." <br />Cotter Response <br />Please see Section 7.0 in Appendix E-4. <br />McArdle Comment F.2. <br />"The reclamation Plan Map should clearly show all permit boundarie~• <br />together with structures to remain on site upon completion of reclamation." <br />Cotter Response <br />Exhibit F has been revised in response to this comment. <br />McArdle Comment G.2. <br />"I have enclosed the March 17, 1983 memo from Jim Pendleton and the <br />March 15, 1983 memo from Joe Oliver. Please respond to each of the <br />• concerns in detail and provide all requested information." <br />Cotter Response <br />Please see Cotter responses to Pendleton Comments 1 - 5 and Oliver <br />Comments 1 - 4. <br />McArdle Comment A.l.a-c. <br />"1. The staff will need the following information in order to complete <br />our review of your cost estimates. <br />a. Please provide details on how the operator arrived at various <br />quantities, hours of operation to complete a job, etc., for <br />each of the outlined reclamation operations. <br />b. How did the operator arrive at 24,200 cubic yards of topsoil to <br />be purchased for placement on the project site? It would asst <br />the State of Colorado a minimum of $8-512/cubic yard of topsoil <br />not delivered, how did the operator arrive at $2.00/cubic yard <br />delivered. Also please specify the truck size and haulage <br />distance. <br />c. Please supply all associated costs for preparation and placement <br />of the Gunite Seals. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.