Laserfiche WebLink
reclamation; <br />(ii) A description of the size and location of each azea to be reclaimed during each phase; and <br />(iii) An outline of the sequence in which each stage or phase of reclamation will be carried out. <br />(The schedule need not be separate and distinct from the Reclamation Plan, but maybe incorporated therein.) <br />(f) A description of each of the following: <br />(i) Final grading -specify maximum anticipated slope gradient or expected ranges thereof; <br />(ii) Seeding -specify types, mixtures, quantities, and expected time(s) of seeding and planting; <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />(iv) Revegetation -specify types of trees, shmbs, etc., quantities, site and location; and <br />(v) Topsoiling -specify anticipated minimum depth or range of depths for those areas where <br />topsoil will be replaced. <br />F.XHiRTT (: -Water information ule 6.4.71: (1) If the operation is not expected to directly affect surface or <br />groundwater systems, a statement of that expectafion shall be submitted. <br />(2) If the operaton is expected to duectly affect surface or groundwater systems, you shall: <br />(a) Locate on the map (in Exhibit C) tributary water courses, wells, springs, stock water ponds, <br />reservoirs, and ditches on the affected land and on adjacent lands where such structures may be affected by the <br />proposed mining operatons; <br />(b) Identify all known aquifers; and <br />(c) Submit a brief statement or plan showing how water from dewatering operations or from runoff from <br />disturbed areas, piled material and operating surfaces will be managed to protect against pollurion of either surface or <br />groundwater (and, where applicable, control pollution in a manner that is consistent with water quality discharge <br />permits), both during and after the operation. <br />(3) You must provide an esthna[e of the project water requirements including flow rates and annual volumes for <br />the development, mining and reclamation phases of the project. <br />(4) You must indicate the projected amount from each of the sources of water to supply the project water <br />requirements for the mining operation and reclamation. <br />(5) You must affirrrratively state that the Operator/Applicant has acquired (or has applied for) a National Pollutant <br />Discharge Elimination System (NPDES) permit from the Water Quality Control Division at the Colorado Department <br />of Health, if necessary. <br />RXHiRiT H -Wildlife information (Rule 6.4.R1: (1) Tn developing the wildlife informafion, you may wish to <br />contact the local wildlife conservation officer. You must include in this Exhibit, a description of the game and <br />non-game resources on and in the vicinity of the application azea, including: <br />(a) a descripton of the significant wildlife resources on the affected land; <br />(b) seasonal use of the area; <br />