Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/26/2006 <br />User : KAP <br />Agency or organization name :Colorado Division Of Minerals And Geoloc <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description : CUf and flll fedUCflO/1 Of %nterlOf <br />HOURLY EQUIPMENT COST <br />State : Colorado PermiUjob# : M-2000-116 <br />County: Saguache Abbreviation :none <br />Site : Villa Grove Pit Filename :M116-001 <br />Basic machine :Cat D8R Series /l - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $53.92 NA <br /> Operating cost/hour : $75.29 100 <br /> Ripper op. cost/hour : $1.60 20 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosUhour : $163.34 Total fleet cost hour : $163.34 <br />,. <br />MATERIAL QUANTITIES ,: <br />Initial Swell Loose <br />volume : 9,982 LCY. factor : NA volume : 9,982 LCY <br /> <br />Source of estimated volume :Assume max 1150' L x 25'H highwall <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION ~ Job Condition Correction Factors ~ Source ~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 65 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,170.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job effciency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.36 (Caf HB) <br />Average push gradient : 16.50 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,880 feet Material weight : 0.71 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,250 Ibs/LCY Net correction : 0.48 <br />Weight description <br />Gravel - Pitrun Adjusted unit production : 560.27 LCYIhr <br /> Adjusted fleet production : 560.27 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 17.82 Hours <br />Unit cost : $0.292 /LCY Total job cost : $2,910 <br />