Laserfiche WebLink
f ~- <br />In addition to these costs there are the indirect costs (contractor's profit, engineering fees, <br />administration fees, etc.) of ] 8.~8% or $340,642. This makes the total increase in liability for the <br />listed tasks $2,174,020. This is more than the total increase in liability needed because several of <br />the costs not listed have been eliminated or have decreased. Much of the grading work in the old <br />estimate has been eliminated because it is being done by bulldozers, in conjunction with the <br />backfilling. Another decrease in cost is in the indirect costs. The percentage dropped from <br />20.39% to 18.58%. <br />Please review this liability estimate and inform the Division as to whether or not the estimate is <br />agreeable to you. If it is not, please detail your concerns. <br />If you have any questions, please call me. <br />Sincerely, <br />D,,~ <br />seph J. Dlldash <br />Environmental Protection Specialist <br />Attachments <br />cc: Basil Bear (Bowie Resources) with sutnmary sheets only <br />c:\ms97\bowie 1 \tr286ond 1 <br />