Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />sss <br />EXHIBIT "M" <br />After checking with the proper departments, we find the onl}~ <br />permit required is an Air Quality Emission Permit. This <br />permit would be required only if the material being <br />e}:tracted was more than ?0,000 ton per year. Since we will <br />never exceed that limit, we are exempt from this permit. No <br />other permits or licenses are required. <br />