Laserfiche WebLink
MR-59 approval decision was issued August 15, 2005. The revision amended Permit Tab 3 <br />Ownership and Control Information. <br />MR-60 approval decision was issued March 13, 2006. The revision amended Permit Tab 3 <br />Ownership and Control Information. <br />Please refer to the Division's mid-term review document of December 22, 2003, Section II- <br />Revisions to the Permit, for a summary accounting of previous revision actions. <br />The Review Process (PR-5) <br />Please refer to Findings Documents of June 15, 2001, May 2, 2003, aad November 17, 2004, <br />respectively, for RN-3, PR-3, and PR-4 Review Process narrative. <br />On May 10, 2005, Seneca Coal Company submitted an application for Permit Revision No. <br />5 (PR-5) for mining and reclamation activities at the Seneca II-W Mine. The application <br />was deemed complete for purposes of filing on May 16, 2005, and wmpleteness <br />notifications were sent to Routt County Commissioners, Routt County Planning <br />Department, OSM, BLM Little Snake Field Office, Water Quality Control Division, State <br />Land Board, NRCS Steamboat Springs Field Office, Air Pollution Control Division, <br />Colorado Geological Survey, Colorado Division of Wildlife, State Historic Preservation <br />Office, U.S Fish and Wildlife Service, and permit area landowner Theresa Friederich. A <br />public notice of the application was published in the Steamboat Pilot once a week for four <br />consecutive weeks beginning May 29, 2005 and ending June 19, 2005. <br />Two comment letters were received during the review. The State Historic Preservation <br />Officer (SHPO) commented in a letter of June 2, 2005 that, because the revision would not <br />result in additional land disturbance, there would be no effect to historic properties. <br />BLM Little Snake Field Office (LSFO) noted in a letter of August 10, 2005, that SCC <br />would need to modify their Resource Recovery and Protection Plan (RZP2) to address the <br />proposed mine plan changes and modified reserve tonnages. <br />The Division issued two preliminary adequacy review letters addressing different issues, <br />the first on July 11, 2005 and the second on August 25, 2005. The BLM/LSFO letter was <br />forwarded to the operator as an attachment to the second letter. The letters requested <br />various clarifications and amendments with respect to operational plans, disturbed area <br />delineations, slope stability demonstration, topsoil removal and distribution plans, drainage <br />channel and stock pond designs, weed control plans, and shrub establishment area details. <br />The Division forwarded the results of a preliminary cost estimate review to SCC in a letter <br />of September 6, 2005. The review determined that the cost estimate previously conducted <br />in association with Permit Renewal No. 4 (RNA), was also applicable to PR-5. RN-4 <br />Seneca II-W Findings Document IO June 12, 2006 <br />Permit Renewal No. 5 <br />