My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97238
DRMS
>
Back File Migration
>
Revision
>
REV97238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:39 AM
Creation date
11/22/2007 12:07:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Revision
Doc Date
11/26/2004
Doc Name
Information for New Bond Release /E-mail
From
Byron Walker
To
Leach Steven
Type & Sequence
SL9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Edna Mine Bond Release Package <br />Walker, Byron <br />From: Walker, Byron <br />Sent: Friday, November 26, 2004 1:11 PM <br />To: 'Leach, Steven (Steve.Leach)' <br />Cc: Hernandez, Dan; Kaldenbach, Tom <br />Subject: RE: Edna Mine Bond Release Package <br />Page 1 of 1 <br />Mr. Leach, this reply is also to your a-mail of 11/11/2004, Edna Mine Bond Release. This package looks <br />appropriate. Please consider the following comments regarding the Utility Facilities Area Bond Release Request <br />page and your public notice. <br />1) the Exhibit 1 (not provided) of Item 14 should clearly identify the 3.3 acres under consideration. <br />2) delete so much of Item 15 that reads "and the hillslope, including the Goat Trail,", change "were" to "was". (The <br />hillslope and the Goat Trail are not part of the subject 3.3 acres.) <br />3) delete so much of Item 16 that reads "As part of Technical Revision 41 (TR-41), a comparison of RUSLE <br />sediment yields was made between pre-mining and current conditions in the conveyor corridor. Current conditions <br />indicate a sediment yield of 55% of the pre-mining conditions." (The conveyor corridor is not part of the subject <br />3.3 acres. If any of this applies to the 3.3 acres, revise it accordingly.) <br />4) to clearly comply with Rule 3.03.2(1)(b), outline and identify the 3.3 acres on your map of the public notice. <br />5) to clearly comply with Rule 3.03.2(1)(b), add to the second paragraph of your public notice a description of the <br />results achieved (reclamation work of the 3.3 acres) as they relate to the approved reclamation plan. <br />Please call me if you have any questions.Yours truly, <br />Byron G. Walker, EPS <br />-----Original Message----- <br />From: Leach, Steven (Steve.Leach) [mailto:Steve.Leach@chevrontexaco.com] <br />Sent: Thursday, November 18, 2004 9:37 AM <br />To: Byron.Walker@state.co.us <br />Subject: Edna Mine Bond Release Package <br />Byron, <br />Here's what I propose to submit as the bond release package. I haven't included the drawing as the file is <br />rather large. Please look it over and let me know if I've missed anything then I'll get it to you officially in <br />paper form. <br />Thanks. <br />Steve <br />«Pad Bond Rel.doc» «Cover Letter-CDMG.doc» «NoticeAddressees.doc» «ReclaimLiab.xls» <br />«Notice of Bond Release Request.doc» «Public Notice.doc» <br />11/26/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.