Laserfiche WebLink
%` <br /> <br />RECLAMATION BOND CALCULATION <br />BUILDINGS: <br />COST <br />Office trailer: (24' x 60'1 - Remove from site ............ $ 500.00 <br />Cuard trailer: (10' x 45'I - Remove from site ............ $ 200.00 <br />Main underground conveyor belt portal building: <br />Cinder block structure with wooden beam roof. Cinder <br />block can be crushed and used to backfill portal. <br />Timber can be transported to lower yard and loaded on <br />flatbed. <br />................ $ 300.00 <br />Main underground conveyor belt: <br />50 HP belt drive, belt take-up unit and 40' of 36' wire <br />rope suspended belt structure. Belt structure will be <br />removed as part of cessation of underground mining <br />operation. 50 HP belt drive and belt take-up unit can <br />be lifted with Case 20 C front end loader and carried <br />to flatbed truck (about 300' away). Two man labor crew <br />and front end loader - approx. 4 hours. <br />................ $ 300.00 <br />Tipple: <br />Tin covered snowshed with open sides, 2" x 12" wood <br />construction & steel support posts (60' x 65'). <br />- 2940 L.F. 2" x 12" Joists @ .34/L.F. .........$1000.00 <br />- 90 L.F. 10" x 10" Steel Columns @ 5.09 L.F. ..$ 458.00 <br />- 200 L.F. 4" x 8" Steel Beams @ 4.07 L.F. .....$ 814.00 <br />- 3900 S.F. Siding, metal, horizontal @ .33/S.F.$1287.00 <br />............... $3559.00 <br />Shed attached to North side of Tipple: <br />Tin covered snowshed with closed sides, 2" x 8" wood <br />construction (18' x 45' x 8'). <br />- Building Demolition @ .16/C.F . ...................... $1037.00 <br />Bins attached to East aide of Tipple: <br />Coal storage bins constructed primarily of 1/4" steel <br />plate, steel posts and large wooden timber 115' x 50' x <br />25'). <br />- Building Demolition @ .16/C.F . ...................... $3000.00 <br />Coal handling bins North of East bins (above): <br />Coal storage bins constructed primarily of 1/4" steel <br />plate, steel posts and large wooden timber (12' x 35' x <br />25). <br />- Building Demolition @ .16/C.F . ...................... $1680.00 <br />January 1994 <br />