Laserfiche WebLink
final reclamation) to be straightened and widened. Presently, only a single lane <br />of traffic can travel on this road segment, due to the location of the debris deposit <br />toe and the Union Pacific Railroad track. A revised final reclaimed configuration <br />map for this site will be provided with this technical revision application. <br />As OMLLC must begin preparation of the east fan shaft backfill stockpile by June <br />2nd OMLLC would appreciate the Division's prompt consideration and approval <br />of this minor revision application. Please call me at (970)929-5834 or Jim Kiger at <br />(970)929-5806 should you have questions or require further information. <br />Sincerely, <br />Kathleen G. Welt, <br />Director of Environmental Affairs <br />cc: Sandy Brown, CDMG <br />Jim Cooper, OMLLC <br />Ben Godwin, OMLLC <br />Bob Koch,OMLLC <br />