Laserfiche WebLink
L.1.5.2 Concrete-Faced Sections .................. .................L-3 <br />• L.1.5.3 Rip Rap -Armored Sections ................ ................. L-4 <br /> L.1.6 Ripping ............................................................... ................. L-4 <br /> L.1.7 Reseeding .......................................................... ................. L-4 <br />L.2 Mine Facilities ................................................................ ................. L-4 <br /> L.2.1 Tailings Disposal Area and Associated Facilities ................. L-4 <br /> L.2.1.1 Tailings Surface Reclamation ............... .................L-4 <br /> L.2.1.2 Northwest Tailings Spillway .................. ................. L-5 <br /> L.2.1.3 Collection Pond .................................... .................L-5 <br /> L.2.2 Water Tank Demolition and Disposal .................. ................. L-5 <br />L.3 Roads ............................................................................ ................. L-6 <br />L.4 Miscellaneous Costs ...................................................... ................. L-6 <br /> L.4.1 Mobilization/Demobilization ................................ ................. L-6 <br /> L.4.2 Road Maintenance ............................................. ................. L-6 <br /> L.4.3 Water Samples ................................................... .................L-7 <br /> L.4.4 Monitoring Well and Piezometer Abandonment .. .................L-7 <br />L.5 Seeding Cost ................................................................. ................. L-7 <br />L.6 Reclamation Summary ................................................... ................. L-8 <br />L.7 References ..................................................................... ................. L-8 <br />EXHIBIT M -COMPLIANCE WITH LOCAL ZONING ............................... M-1 <br />EXHIBIT N -OTHER PERMITS AND LICENSES ......................................N-1 <br />EXHIBIT O -SOURCE OF LEGAL RIGHT-TO-ENTER ............................ O-1 <br />• EXHIBIT P -OWNERS OF RECORD OF SURFACE <br />AND SUBSURFACE RIGHTS FOR PERMIT AREA AND <br />ADJACENT LANDS ...............................................................P-1 <br />LIST OF TABLES <br />Table G.2-1 Pond Stage Summary <br />Table G.2-2 Normal Flow Depth, 8-inch SDR 17 (7.611 ID) at 550 gpm <br />Table G.3-1 Proposed Phase II Monitoring Locations and Frequency <br />Table G.3-2 Surface Water Sampling Locations, Ground Water Wells, and <br />Lysimeters to be Abandoned <br />LIST OF FIGURES <br />Figure C-1 <br />Figure F-1 <br />Figure F-2 <br />Figure F-3 <br />Figure F-4 <br />• Figure F-5 <br />Figure G.2-1 <br />Site Plan <br />Mine Site Reclamation Plan <br />Intentionally Left Blank <br />Intentionally Left Blank <br />Revised Tailings Reclamation Plan <br />Reclamation Plan for Roads and Pipeline <br />Pit Flows <br />Battle Mountain Resources, Inc. 11 Telesto Solutions, /nc. <br />P:(PmjpuV.l2-Newnwvt(SenLuis)IGnLUiSPe~mit AmeMmevt- West Pit MvugementWeimitAmendment_a3.0oc July 2006 <br />