Laserfiche WebLink
• <br /> <br />• <br />Table G.2-1 Pond Stage Summary <br /> Storage Volume (acre-feet) <br /> Pool Area Elevation Freeboard <br />Condition <br /> Below Above (Acres) (ft-amsl) (ft-amsl) <br /> Total <br />Grades) Gradet') <br />Normal <br />operation, 134.4 61.5 72.9 11.3 8165.9 2.1 <br />average year <br />Maarimum.pool 158.5 61.5 97.0 11.8 8168.0 0 <br />Note: 1 Based on a statutory ground elevation of 8159.0 fr-amsl. <br />G.2.3 Irrigation Pipeline Design <br />Construction of an irrigation water pipeline is required to deliver water from the West <br />Pit azea to irrigation pond located on the BMRI Ranch. The irrigation pipeline will <br />convey water pumped from the West Pit and interceptor wells to the pumping vault in <br />the new irrigation pond at the ranch. The pipeline is designed to have the capacity to <br />convey the flow from the West Pit wells and [he two alluvial aquifer interceptor <br />wells. Except in five sections of the pipeline that will have adverse slopes due to <br />existing topography, the pipeline will have sufficient capacity to convey the design <br />flow under non-pressurized, gravity-flow conditions with the pipeline flowing <br />partially full. Air vacuum-air release valves will be located at high points to vent the <br />pipeline during filling and draw air into the pipeline at locations where the flow <br />regime transifions from full pipe flow to partially full pipe flow. Specific pipeline <br />design criteria are presented herein. <br />The following design conditions were developed to guide the irrigation pipeline <br />design process: <br />• Define a pipeline alignment between the West Pit wells and the proposed <br />location for the new irrigation pond. The alignment will : (1) be located <br />entirely on property either owned by BMRI, where BMRI holds an <br />existing easement, or within the limits of existing public right of ways, (2) <br />not interfere with major site facilities, and (3) minimize pipeline length <br />while avoiding excessive earthworks for pipeline construction. <br />Suttle Mountain Resources, lnc. G-6 Telesto Solutions, lnc. <br />P:Nrojects~212-Newmom(SanLUU)15mLUis~Petmu AmeMment- West Pi[MenaBement~Pe[mitAmentlmen[_v3.Aa July 2006 <br />