Laserfiche WebLink
EXHIBIT F -RECLAMATION PLAN MAPS <br />The general site reclamation plan map, Figure F-1 of the approved permit, has been <br />revised and is included in this section. Figures F-2 (pit area reclamation contours; <br />TR-18) and F-3 (early mine termination alternative; TR-18) remain unchanged and <br />have not been reproduced for this document. Anew figure, Figure F-4 shows the <br />revised tailings reclamation plan for the TDA. This figure shows the location of the <br />spillway that will drain the final regraded and reclaimed TDA surface. A second new <br />figure, Figure F-5, presents the reclamation of the irrigation pipeline and the location <br />of the irrigation pond. <br />u <br />• <br />Battle Mountain Resources, /nc. F-1 Te[esto Solutions, /nc. <br />v:woi~~~aNew~mtsw.,~>vs~~.~~w~~~ a~~a~~~ - w~ w Man~gomea~ve~munmevamex .s.a« July 2006 <br />