My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97082
DRMS
>
Back File Migration
>
Revision
>
REV97082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:33 AM
Creation date
11/22/2007 12:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
3/12/2007
Doc Name
Correspondence Letter
From
OSM
To
DRMS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~.k <br />IN REPLY REFER TO: <br />United States Department of the Interior <br />OFFICE OF SURFACE M[NING <br />Reclamation and Enforcement <br />P.O. Box 46667 <br />Denver, Colorado 80201-6667 <br />Mazch 8, 2007 <br /> <br />r1NR 1 ~ 2001 <br />Mr. Dave Berry, Program Supervisor Diws~. ~~ of Reclamation, <br />Division of Mining, Reclamation and Safety Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Mr. Berry: - - - - - - - - <br />By letter dated February 12, 2007, we required you to submit information on how <br />Colorado could meet the requirement for its regulatory program to be consistent with 30 <br />CFR 817.121(c)(5). Our letter asked for either a proposed amendment or a description of <br />an amendment and timetable for submission. 30 CFR 817.121(c)(5) requires, if <br />subsidence-related material damage occurs to land, structures, or facilities protected <br />under 30 CFR 817.121, the regulatory authority must require the permittee to post <br />additional performance bond in the amount of the estimated repair costs or diminution in <br />value. Our letter was pursuant to 30 CFR 732.17, which addresses required program <br />amendments and was result of the recent complaint alleging subsidence damage caused <br />by Basin Resources' (Basin) Golden Eagle Mine. Colorado could also respond with an <br />explanation of existing authority consistent with 30 CFR 817.121(c)(5). <br />By letter dated February 15, 2007, you responded that the federal requirement to bond for <br />subsidence-related material damage can be implemented through existing Colorado Act <br />and regulations. You stated that additional legislation or rulemaking is not needed at this <br />time. Subsequent to your response to OSM you notified Basin by letter dated March 2, <br />2007, that additional bond must be posted for the subsidence damage compensation. <br />Your notice to Basin initiated the bond adjustment process specified in State rule <br />3.02.2(4)(a). <br />We agree with your determination that the Federal requirement to bond for subsidence- <br />related material damage can be implemented through existing Colorado Act and <br />~NAMERICA~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.