Laserfiche WebLink
<br />RECLAMATION COST EVMMARY con['d <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />cask No.~ Task Descrip[ion <br />________I______________________________________. <br /> <br />sheet 7 of 4 <br />~ Cost l51 <br />__I____________ <br />Subtotal IH): <br />I. EARTHWORK - DRAINAGE COKIROL 5Y57EM INSTALLATION/REMOVAL <br />cask No.~ Task Oesctip[ion ~ Cost ($) <br />________I___________________________„_________________________________ <br />________________________________________________________________________ <br />Subtotal lI): <br />J. EARTHWORK - TOPSOIL/SVBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (51 <br />1 ~ Replace Growth Medium on Benches ~ 516, RB9 <br />2 ~ Replace Growth Medium on puarry Floor ~ 534,30"/ <br />Subtotal (J1: 543,196 <br />